Wellcamp Prefabricated Office Building in Oman Project

Basic Information

STEEL: Square tube
ROOF: 50mm EPS sandwich panel

WALL: 50mm EPS sandwich panel
DOOR: Steel door outside and aluminium door inside
WINDOW: PVC sliding window

The area of this Oman project is about 1,000 square meters. It's intended use for the office and prayer room. Bacause of the longspan width, we use three parts steel structure at the gable wall side in order to improve the accuracy of the horizontal and vetical plane. We send 2 international engineers to guide the local workers(about 5 people) and they spent less than 1 month on finishing this project. 


If you are interested in this series, please click here.
If you have any questions, please contact us right now and we will answer you soon.                                                                            

Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: