Tailored Camp Solutions to Meet Custom Needs.
Product usage scenarios
Requirements: "The project cycle is 1-2 years, with 1,000-1,500 workers. It needs to be fast to build, low-cost, and relocatable";
Solutions: The WELLCAMP 1000–1500 people labor camp solution is composed of 300–400 double-room dormitory modules, supported by 15–20 bathroom units and 6–8 canteen modules. This modular configuration creates a complete living and working community, including dormitories, dining halls, offices, and medical rooms. Designed for fast deployment, durability, and comfort , the camp ensures safe and reliable accommodation for Construction site camp projects.
Mining camp/oil & gas camp
Requirements: "Located in remote areas (mountainous areas/deserts), with harsh
environments (high temperatures/severe cold), requiring durability, wind resistance, and independent water and power supply.
Solution: "Customized, cold-resistant modules, combined with a solar power system, enable a camp for 2,000 people to operate independently off the grid."
Emergency/temporary accommodation
Demand: "Post-disaster reconstruction, large-scale event logistics, requiring a quick response within 1-2 days, to meet temporary accommodation + basic living needs"
Solution: "Prefabricated fully-equipped modules (with interior decoration completed before leaving the factory), only water and electricity connections are required on site, a single module can accommodate 4 people, and can support the rapid resettlement of 100-1500 people
Infrastructure camp
Expandable camp house
Category | Core Data (Example) | Advantage Interpretation (Addressing Project Pain Points) |
Dimensions | Single module: 3.9m × 5.15m × 2.5m Expanded area ≈ 20m², combinable for larger layouts | Integrated transport, fully unfolded on-site in 10 minutes, no complex construction, significantly saving time |
Construction Time | 50-person camp: 3 days 500-person camp: 7 days | 5× faster than traditional prefab houses, solving the urgent need for “accommodation as soon as workers arrive” |
Wind Resistance | Wind load up to Level 10, temperature resistant from -30℃ to 40℃, 100% waterproof | Suitable for extreme environments such as plateaus, coastal areas, deserts, and mining sites, reducing maintenance costs |
Environmental Performance | Materials are recyclable | Meets green building standards, avoids environmental approval issues, and protects workers’ health |
Diverse product selection
Why choose us?
Solution Type | Construction Period | Labor Cost per Unit |
Relocation Reuse Rate |
Environmental Compliance |
Traditional Prefab House | 15-30 days | 100% | 30% | Average (Formaldehyde easily exceeds standard) |
Temporary Brick Building | 60-90 days | 200% | 0% | Poor (Demolished after use, no reuse) |
WELLCAMP Modular Camp House | 3-7 days | 85% | 90% | Excellent (Recyclable + Low formaldehyde) |
Contact: Siwen Chen
Tel: +86 13902808995
E-mail: siwenchen@chinawellcamp.com
Address: Unit 804, 8th Floor, Block A, 115 Jihua 4th Road, Chancheng District, Foshan City, Guangdong Province, China
Factory Address: No.7 Wende 4th street,Dawang High -Tech Zone, Zhaoqing, Guangdong, China