This Prefabricated labor camp was built in Doha, Qatar, which more than 102424 square maters. Inside have the office, dormitory, restaurant, WC room, shower room, Recreation room, health facilities room and security room. 8000 labors live in it.
The characteristics of this camp are very modern and clean, because all the steel structure is hidden inside the house. It can be normally used more than 20 years.
Prefab House-Office | 12MX24MX6H | Prefab House-Dormitory | 18MX84.8MX6H |
---|---|---|---|
Prefab House-Restaurant | 27.15MX124MX4H | Prefab House-WC Room | 11.4MX19MX3H |
Prefab House-Shower Room | 11.4MX19MX3H | Prefab House- Recreation | 21MX32MX4H |
Prefab House-Health Facilities Room | 9MX20MX3H | Prefab House-Security Room | 10MX12MX3H |
3D Overall Layout
Style | Specification(M) | Area(m²) | Qty(set) | Total Area(m²) |
---|---|---|---|---|
Prefab House-Office | 12MX24MX6H | 600 | 15 | 9000 |
Prefab House-Dormitory | 18MX84.8MX6H | 3204 | 22 | 70488 |
Prefab House-Restaurant | 27.15MX124MX4H | 3398.6 | 4 | 13594.4 |
Prefab House-WC Room | 11.4MX19MX3H | 216.6 | 12 | 2599.2 |
Prefab House-Shower Room | 11.4MX19MX3H | 216.6 | 12 | 2599.2 |
Prefab House- Recreation | 21MX32MX4H | 736 | 4 | 2944 |
Prefab House-Health Facilities Room | 9MX20MX3H | 180 | 4 | 720 |
Prefab House-Security Room | 10MX12MX3H | 120 | 4 | 480 |
Prefab House-Restaurant CAD Plan
Prefab House- Restaurant 3D Plan
INSIDE LOOKING | INSIDE LOOKING |
OUTSIDE LOOKING |
Prefab House- Restaurant Main Materials
Steel structure | Column | "H" section steel |
---|---|---|
Beam | "H" section steel | |
Purlin | "C" section steel | |
Panel | Wall panel | 50mm PU sandwich panel |
Roof panel | 50mm PU sandwich panel | |
Accessories | Window | Aluminum sliding window |
Door | Double opening steel door |
Prefab House- Restaurant Technical Parameters
Window resistance | Grade 11(wind speed<120 km/h) |
---|---|
Earthquake resistance | Grade 7 |
Snow load capacity of roofing | 0.6kn/m² |
Live load capacity of roofing | 0.6kn/m² |
Wall permitted loading | 0.6kn/m² |
External and internal wall heat transmission coefficient | 0.35kcal/m²hc |
Delivery time | Normally 20-25 days |
Prefab House- Restaurant Installation Photos
Prefab House- Offices( More choices) More>>>
Copyright © 2022 广东威尔坎普钢结构模块化房屋有限公司 All Rights Reserved Design by www.prefab-house.com