How to build the roof of rural light steel villa? |The most detailed explanation of the light steel roof construction process in history! -wellcamp light steel villa manufacturers

Roof skeleton installation 1. After the roof skeleton assembly is completed, the roof skeleton assembly and construction can be started. 2. 2-4 people jointly lift a roof frame and move it to the designated location for installation. 3. For a roof skeleton, adjust the bottom guide beam first, and the bottom guide beam and the top guide beam of the wall are arranged to overlap. Then use self-drilling screws to temporarily fix it. Then adjust the verticality of the whole skeleton, and use the magnetic force line pendant to adjust the verticality. After installing one roof skeleton, use light steel rods to temporarily fix it first to ensure that other roof skeletons will not move during construction. 4. Then install other roof skeletons from side to side in accordance with the 'Roof Frame Installation Details' to ensure that the position and verticality of each truss meet the requirements. 5. The support system includes: upper chord support, lower chord support, vertical support and other supports. In addition to temporary reinforcement rods during the installation of the roof skeleton, it is necessary to install the support system in time to ensure the safety and stability of the structure. 6. Install all roof trusses from side to side in a similar manner. 7. After the roof truss is completed, see the following picture: 2. After the roof structure plate is installed and reinforced, the cornice is adjusted to ensure that the cornice is level, and then the roof structure plate is installed and constructed. The structure plate adopts imported osb plate. 1. Tool preparation: hand-held cutting machine, hand-held electric drill, self-drilling screws, etc. 2. Structural board installation 2.1 Imported osb board size is 2440×1220mm, the floor beam spacing is 610mm, just one osb board is placed for every 3 sets of roof trusses to ensure that each board can be overlapped with the roof truss beam. 2.2 After laying the osb board, use a hand-held electric drill to set the self-drilling screws to fix it. 2.3 The roof structural plates should be laid in staggered joints as much as possible. If there is no keel at the lap joint, steel straps must be added to meet the requirements of nailing, so as to enhance the strength of the roof structural plate. 2.4 Because the construction of the roof structural board is a high-altitude operation and the roof is inclined, it is necessary to temporarily fix short light steel members on the laid structural board to provide work support and temporary stacking of small tools for the construction workers. 2.5 The self-drilling screws shall be set according to the requirements of Table 8.2: the position and spacing of the self-drilling screws are allowed deviation!

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect