How to build the roof of rural light steel villa? |The most detailed explanation of the light steel roof construction process in history! -wellcamp light steel villa manufacturers

Roof skeleton installation 1. After the roof skeleton assembly is completed, the roof skeleton assembly and construction can be started. 2. 2-4 people jointly lift a roof frame and move it to the designated location for installation. 3. For a roof skeleton, adjust the bottom guide beam first, and the bottom guide beam and the top guide beam of the wall are arranged to overlap. Then use self-drilling screws to temporarily fix it. Then adjust the verticality of the whole skeleton, and use the magnetic force line pendant to adjust the verticality. After installing one roof skeleton, use light steel rods to temporarily fix it first to ensure that other roof skeletons will not move during construction. 4. Then install other roof skeletons from side to side in accordance with the 'Roof Frame Installation Details' to ensure that the position and verticality of each truss meet the requirements. 5. The support system includes: upper chord support, lower chord support, vertical support and other supports. In addition to temporary reinforcement rods during the installation of the roof skeleton, it is necessary to install the support system in time to ensure the safety and stability of the structure. 6. Install all roof trusses from side to side in a similar manner. 7. After the roof truss is completed, see the following picture: 2. After the roof structure plate is installed and reinforced, the cornice is adjusted to ensure that the cornice is level, and then the roof structure plate is installed and constructed. The structure plate adopts imported osb plate. 1. Tool preparation: hand-held cutting machine, hand-held electric drill, self-drilling screws, etc. 2. Structural board installation 2.1 Imported osb board size is 2440×1220mm, the floor beam spacing is 610mm, just one osb board is placed for every 3 sets of roof trusses to ensure that each board can be overlapped with the roof truss beam. 2.2 After laying the osb board, use a hand-held electric drill to set the self-drilling screws to fix it. 2.3 The roof structural plates should be laid in staggered joints as much as possible. If there is no keel at the lap joint, steel straps must be added to meet the requirements of nailing, so as to enhance the strength of the roof structural plate. 2.4 Because the construction of the roof structural board is a high-altitude operation and the roof is inclined, it is necessary to temporarily fix short light steel members on the laid structural board to provide work support and temporary stacking of small tools for the construction workers. 2.5 The self-drilling screws shall be set according to the requirements of Table 8.2: the position and spacing of the self-drilling screws are allowed deviation!

GET IN TOUCH WITH Us
recommended articles
FAQ Knowledge News
Do you provide samples or physical products for evaluation?
To support our clients' evaluation needs during the product decision-making process, we offer the following methods for viewing and experiencing physical products.
What are WELLCAMP's payment terms?
We support mainstream international payment methods such as wire transfer (T/T). The specific method to be used will be clearly stated in the contract.
What is WELLCAMP's minimum order quantity (MOQ)?

Regarding minimum order quantities, we typically establish reference standards based on the production characteristics and logistics efficiency of different product types, while also considering negotiations tailored to each customer's specific circumstances.
How do I place an order?
Our procurement process primarily consists of the following steps
Does WELLCAMP offer customization services?

Yes, customization is one of the services WELLCAMP provides. We recognize that different projects may have varying requirements, so we offer tailored solutions designed to translate your needs and budget considerations into a product that meets your specifications.
Does WELLCAMP offer design services?

In addition to product manufacturing, WELLCAMP provides design services related to construction projects.
How can durable and affordable housing solutions be rapidly provided after a disaster?

In response to post-disaster emergencies, WELLCAMP's transitional housing solutions prioritize rapid deployment, structural durability, and cost control to help affected communities restore basic living conditions.
What advantages does WELLCAMP modular camp offer compared to traditional accommodations?
WELLCAMP's modular camp solutions provide an alternative to conventional construction methods. Its distinctive features in efficiency, cost, and sustainability are as follows.
 For which application scenarios can WELLCAMP provide camp solutions?

Based on its diversified product lines and industry experience, WELLCAMP delivers rapid construction solutions for various temporary, semi-permanent, and specialized accommodation and space requirements.
What materials are used in your homes?
We prioritize material selection to create safe, durable building spaces. We utilize various construction materials designed to deliver reliable returns on your investment.
no data
Customer service
detect