loading

Tailored Camp Solutions to Meet  Custom Needs.

Xinyu accelerates the construction of prefabricated construction industry bases

Vehicles shuttled and machines roared on the construction site, and dozens of skilled workers wearing safety helmets were nervously carrying out the construction of the independent foundation and ground beams of the base workshop... This is what I saw at the project site of the Xinyu Prefabricated Construction Industry Base. A busy scene. This year, Xinyu City vigorously develops prefabricated buildings. The Xinyu City Prefabricated Building Industry Base Project invested and constructed by Jiangxi Guangxin Construction Industry Co., Ltd. led by the Municipal Investment Control Group is accelerating the construction with the strong support of the Municipal Party Committee and Municipal Government. At present, the independent foundation and ground beams of the base plant have been completed, and the roads outside the plant, the silo, cleaning tank, and sewage treatment system of the concrete mixing plant are being constructed in an orderly manner. It is expected to be put into operation by the end of the year. According to Zhang Jianyu, the person in charge of the project of the Municipal Investment Control Group, the entire construction site is in strict accordance with the requirements of safe and civilized construction standards, and is uniformly arranged and arranged. It is divided into living areas, green areas, construction areas, model areas, and office areas. It has achieved a beautiful construction environment, safety of on-site facilities, socialization of logistics support, and standardization of labor protection. It is understood that the prefabricated construction industry base in Xinyu City is one of the key construction projects in Xinyu City. It is located at the intersection of Fairy Lake Avenue and Huancheng West Road, Fairy Lake District, Xinyu City. , energy conservation and emission reduction, environmental protection and sustainable development needs. It is planned to build a PC component production base, a new construction material production base, a high-performance concrete mixing station, and a prefabricated building technology research and development center. The total investment of the project is about 1 billion yuan, and the planned land area is about 500 mu. After the project reaches production, it will provide employment to the society. There are more than 600 jobs, and the annual tax income is at least 30 million yuan.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect