What standards should the installation of residential containers meet?

The residential container is also one of the container houses, which is mainly used to meet some temporary housing needs, which can quickly provide a comfortable living environment and solve the living difficulties of many people. In order to ensure the safe use of residential containers and effectively prolong the service life, some relevant standards must be met in terms of installation. Today Wellcamp will take you to find out.

1. The installation of steel structural parts must meet the standards. There should be no omissions in the places that need to be welded, let alone welding by mistake. The welding should be done in the correct place, otherwise the connection may not be strong or even the welding seam may crack in the later stage. ;

Second, the installation of the box room wall should be horizontal and vertical, the caulking should be dense and smooth, the depth and width of the seam should be consistent, and the board surface should not be damaged;

Third, if you need to paste wallpaper indoors, make sure that the wall is smooth without bubbles, clean and tidy;

Fourth, the ceiling assembly should be flat, the gaps should be aligned, the gaps should be consistent, the wallpaper should be clean and tidy, the board surface should not be broken, and the damaged wallpaper surface should be repaired immediately during transportation;

Five, the floor should be laid with ash, and the floor with cracks on the surface is prohibited from being installed and used again;

Six, the surface of the cement or fine stone concrete surface should be pressed tightly, and there should be no cracks, peeling, sanding, hollowing, etc.;

Seven, asbestos tiles must be laid in the leeward according to the characteristics of the local wind direction, and the cornice should be kept straight, the tiles should not have cracks, the length of the vertical overlap of asbestos tiles should not be less than 100mm, and the horizontal overlap of medium wave tiles should not be less than 100mm. Less than one wave, the small wave tile should not be less than two waves, each asbestos tile of the tile hook is two fixed points, the tile hook should be properly tightened, and there should be no water leakage on the roof;

Eight, the joints of the white tin gutter of the residential container are welded firmly, and the joints should be treated with anti-corrosion. There should be no accumulation of water or leakage in the gutter.

Nine, the doors and windows are installed accurately and only fastened with bolts.

The above are some of the standards that the residential container must meet during the installation process. Only when the installation is carried out in strict accordance with the standards can the safety and service life of the house be guaranteed, and the living can be more secure.

Whenever the question of mobile home prices modern manufactured homes is raised, one comes across the term ''.

Super quality are in offer at WELLCAMP Prefab-House, welcome to visit us.

pre manufactured homes can also provide a new, productive option for business owners, if you're willing to use it.

A technology team created for insuring that new manufactured homes for sale is produced with the finest materials and technologies.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
Customer service
detect