loading

Tailored Camp Solutions to Meet  Custom Needs.

What should be paid attention to when using container modular house - Non-standard container Wellcamp-Professional container production

In modern buildings, container modular houses may be used in temporary residences, factories, schools in remote areas, tourist hotels, construction site dormitories, exhibition halls, etc. Professional container modular houses are generally made of steel or iron, which are easy to install and disassemble, with various colors and rich architectural elements. Next, let’s learn about the things to pay attention to in the use of container modular houses with Xiaobian. 1. Fix it on the ground as much as possible. Nowadays, many container module houses use color steel plate structure for the sake of architectural beauty. The weight of the color steel plate structure is slightly lighter than that of the all-steel structure. When using it, it should be firmly fixed by the bottom fixing device. on the ground in case of storms. Generally speaking, in the inland areas of our country, the wind is small, and the first-class container module houses can generally withstand blowing blows. However, in coastal cities, typhoons occur from time to time, and the container module houses should be reinforced as much as possible. 2. Pay attention to fire prevention and do a good job of fire prevention in container module houses. Usually, attention should be paid to: first, do not carry out electric welding construction near the wall; second, certain fireproof devices should be used when using stoves in container module houses in winter; third, the laying of lines inside the container should be Use metal pipes or refractory pipes as much as possible, and ensure that the lines are grounded; fourth, for container module houses that need to be waterproofed, it is forbidden to use flammable items such as blowtorches in the house materials. 3. Pay attention to multi-layer superposition The multi-layer superposition referred to here refers to the superposition of more than three layers or more. For some container module houses made of color steel plates, due to their low texture, there may be serious safety hazards in multi-layer stacking. The above mentioned are the precautions in using the container module house. Among them, the multi-layer superposition is a point that can be discussed. In modern architecture, many architects add valuable container modular house elements into the main body of the building, and some architects will use multiple stacking methods, but the stacking is usually in the selection of container materials, process methods, and force-bearing mechanisms. All have been specially designed. If it is really necessary to stack multiple layers to obtain a certain aesthetics, it can also be completed through special design.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service