What problems should be paid attention to in the process of building a packing box?

Due to the convenience of disassembly and assembly of the packing box, the temporary project departments of many construction sites choose to use the packing box to build it, and it can be put into use soon. So what problems should we pay attention to during the construction of the packing box? The following Wellcamp packing box manufacturers will take you to find out:

First, we have to decide on the choice of material and frame structure. Regular construction sites should purchase fireproof sandwich panels that meet national requirements. The materials of the sandwich panel are mainly glass wool, rock wool, phenolic, siliceous rock, and ageless foam. Various materials on the market have their own advantages and disadvantages. Glass wool and rock wool are cost-effective, so they are often used in the construction of prefabricated houses. For the frame of the packing box, the mainstream on the market are the plate-welding structure type and the bolt-assembly type. If the budget is low and the admission time is urgent, the assembly type can be considered, but the style is fixed and the wind resistance is poor; the plate-welding type High cost performance, high wind resistance, and the normal service life can reach 6 to 8 years when the air in coastal areas is severely corrosive.

Second, the location and quantity of the prefabricated boxes to be used in the CAD planning on the temporary construction site. Now that the urban land is tight, in order to meet the accommodation and dining functions of the entire project office, it is often necessary to place a two-story packing box. Qualified project departments, ordinary office buildings are set up with double-storey packing rooms, dormitories are set up with one or more buildings, restaurants and entertainment rooms are set on both sides of the office buildings. In the center, the combination of moving points is a combination of restaurants and activity rooms used by people. When making land plans, keep the boxes as far away from the mountain as possible, place the boxes in a safe area outside the operating range of the construction tower suspension, etc., and place the dormitory packing boxes used as occupants in a hidden position in the back row. Because it is not only quiet, but also visually avoids the messy feeling of drying clothes in the dormitory area.

Third, after the large area is determined, the rope can be pulled on the spot to start the work of laying the foundation of the packing box mobile house. The main advantage of making the drainage canal packing box mobile house is that the requirements for soil hardening are not like construction activities. The board house is so high, if conditions permit, all can harden concrete horizontally. To reduce the budget, build the floor with bricks, or use concrete to invert two 30cm-wide ground beams with a 6m external spacing.

Fourth, the design of the office space packing box activity room. Generally, a 3 * 6 * 2.8 meter packing box can place 2~3 single tables. If you need a large conference room, you can use 2~4 packing boxes to create a large space. If you want a packing box, the house has both office and living functions. , can be cut off. The 6-meter partition is 2.5 + 3.5 meters, 2.5 meters is enough for the interior lounge, and the air conditioner can be reserved in the middle of the partition, so that both sides can be used.

The above is an introduction to the precautions during the construction of the packing box. You can refer to it when building the packing box, hoping to bring some help to your work. The construction of the packing box activity room is relatively simple among many activity rooms, but it should not be taken lightly when building, and it should be carried out gradually in accordance with the construction standards, so as to provide sufficient security for subsequent use.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD has a great reputation on producing innovative products as the pre manufactured homes.

For more information please see our site at WELLCAMP Prefab-House. Don't be hesitate to contact us!

luxury manufactured homes problems are nothing new, almost every one of us have to go through them at some point of our lives and some of us never get rid of them. with the development of cheap manufactured homes technology, now provides a perfect cure for that.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect