What precautions should be taken during the installation and use of container houses?

Container houses are widely used in the construction of modern society, especially for temporary construction of some construction sites, temporary construction of scenic spots, temporary construction of large-scale activities and post-disaster reconstruction work. The buildings are different, so there are some problems that need to be paid attention to in the process of installation and use. The following Wellcamp container houses china manufacturers will take you to understand.

1. Construction of waterproof membrane

1. In the construction of waterproofing membrane, after cleaning the base layer, brush glue on the reverse side of the membrane and base layer, paste and roll according to the elastic baseline from far to near, and finally do joint treatment. After completion, water storage should be carried out. test;

2. Waterproof paint, take 'one cloth and two paints' as an example, after the base layer is cleaned, brush the paint on it, wait for it to dry to form a film, lay a layer of glass fiber cloth matrix to reinforce, cover the base layer, The flat surface is coated with a layer of paint to fix it, and the waterproof construction of the next roof is carried out after it is completely dry;

3. When laying a rigid waterproof layer, the construction should be carried out about two days after the completion of the first flexible waterproof layer. The basic materials mainly contain high-fatty acid mortar waterproofing agent, cement, sand, fine stone aggregate, fiber, etc., and the waterproof layer The thickness should be 20-30mm.

Second, the thermal insulation and sound insulation of container houses

Depending on the environmental climate of the project site, the thermal insulation materials required for container houses will also vary.

1. Spray polyurethane foam inside the container, add 50-100mm glass rock wool board, moisture-proof and anti-corrosion, sound insulation and heat insulation. Air conditioning is installed indoors in the south, floor heating is installed in the north, and the outer layer is covered with decorative materials, such as pine board, gypsum board, cement fiber board, polymer assembly board, etc.

2. Inside the container: In order to meet the fire resistance and heat insulation requirements of walls and ceilings, glass rock wool sandwich panels with a thickness of not less than 50 are required.

3. The exterior of the container is generally decorated with exposed graffiti on the wall, glass, aluminum plate, anti-corrosion wood, cement fiber board and other curtain walls.

3. Lightning protection measures for container houses

If the container house is used in the wild, the iron container house is at risk of being struck by lightning in thunderstorm weather, so the installation of lightning protection is also very important for the container house. In addition to lightning protection measures, if the container houses china has Stairs, balconies and other structures should be welded with fences.

The above are some precautions during the installation and use of container houses. Only by fully understanding the characteristics of container houses and maintaining them can we ensure the safety of our use and effectively prolong the service life of the house.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD is famous for creating innovative products like the new manufactured homes for sale and supporting their market leadership with savvy marketing campaigns to build an elite brand.

At Guangdong WELLCAMP BUILDING MATERIALS CO., LTD, we make sure everything we do honors that connection – from our commitment to the highest quality in the world, to the way we serve our customers and communities to do business responsibly. We are looking forward to becoming trusted supplier of every customer, inquire us at WELLCAMP Prefab-House!

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD are trained to think about problems and coming up with solutions, as well as presenting the whole idea in a logical and coherent manner.

The lower cost of mobile home manufacturers, compared to other product, and Guangdong WELLCAMP BUILDING MATERIALS CO., LTD’s services provide may well suit the needs for customers.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect