loading

Tailored Camp Solutions to Meet  Custom Needs.

What are the standards for the construction of the ceiling of light steel houses? Light steel villa manufacturers-wellcamp light steel villa manufacturers

The ceiling keel is actually two different concepts. The ceiling refers to the decoration of the top of the living environment of the house, that is, the decoration of the ceiling, which is a particularly important part of the interior decoration. The keel refers to the key ceiling material made of light steel, which is used to fix the ceiling or other objects. So what are the construction conditions of the ceiling keel, and what are the standards for its material? Then let the simple life editor tell you slowly! 1. The light steel skeleton is divided into two types: U-shaped skeleton and T-shaped skeleton, and is divided into upper and lower according to the load. 2. The main parts of the light steel frame are large, medium and small keels; the accessories include hanging parts, connecting parts, threading, support cards, and hanging plug-ins. 3. Accessories: there are boom, hanger and keel forceps, flower blue screws, self-tapping screws. 4. Various types of cover panels can be selected according to the design instructions. Aluminum pressure strips or plastic pressure strips, their material varieties. Specifications. The quality should meet the design standards. 5. Binder: It should be selected according to the performance index of the main material, and the bonding test should be done before use. Key tools: chainsaw, toothless saw, hand saw, hand plane, pliers, screwdriver, wrench, square ruler, steel ruler, steel level, etc. Operating conditions: 1. During the construction of the structural engineering, the joints of the cast-in-place concrete floor or prefabricated concrete floor should be pre-buried according to the design standards.φ6~φ10. Reinforcing bar mixed with suspenders. When there is no standard design, the reinforced suspenders are pre-buried according to the arrangement of the large keels, and the general spacing is 900~1200mm. 2. When the wall column of the ceiling room is brick masonry, the anti-corrosion wood bricks should be pre-buried along the wall and the surrounding of the column at the elevation position of the ceiling, and the distance along the wall should be 900~1200mm. More than two wooden bricks. 3. After installing all kinds of pipelines and ventilation channels in the ceiling, determine the position of lights, ventilation openings and various exposed openings. 4. All kinds of materials are available. 5. Before installing the ceiling cover panel, the wall and ground wet work projects should be completed. 6. Set up a shelf for the construction and operation platform of the ceiling project. 7. The light steel frame ceiling should be used as a model room before the construction of large-scale projects. The camber of the ceiling, the structural treatment of the light trough, the ventilation opening, the block and the fixing method should be tested and confirmed after the identification. Large-scale engineering construction. These are the introductions about the material and operating conditions of the keel. Do you want to know more about the keel? Then continue to pay attention to the simple life of Henan!

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
Customer service
detect