What are the procedures and precautions for building a container office?

The container office is similar to the construction of a building. The surroundings and the foundation of the partition wall are leveled, and reinforced concrete is used to be relatively strong. Then erect the pillars, connect the frame with transverse beams, put up partitions, external wall panels and door and window frames; then lay the floor, and then install one floor, then the roof truss and roof panel; install doors and windows, etc., and pull the vertical supports. There are sanitary ware, small hardware and the like. Construction requirements 1. Gray line stakeout: Measure according to the location of the floor plan of the living area. 1) Residential container components The installation position of each component should meet the design requirements, and the location of the on-site welding parts should be accurate, and there should be no false welding or missing welding. 2) Fasteners a. Fasteners should meet the requirements of GB5782. b. The bolts should be installed in the correct position and gaskets should be installed according to the design requirements. There should be no missing or missing installation. C. The connecting bolts between the components should be tightened. 3) Paint a. The place where the primer peels off during on-site welding and transportation should be painted with a layer of anti-rust paint. b. The exposed parts of the components should be painted with a second layer of top paint. The paint shall not have the phenomenon of missing brushing, peeling, hanging paint and returning rust. 4) Wall a. Correct the container office and wall according to the layout plan. The corners and external corners of the umbrella wall are sealed with angle aluminum. The connection between the plates and the plates is made of I-shaped aluminum, and the walls must be vertical. The caulking depth should be the same, neat and clean, the wall should be clean, the color should be the same, the board seam should be neat, the nailing surface should be consistent up and down, and there should be no misalignment, and the necessary parts should use self-tapping bolts. b. Mark the position of the doors and windows of the container conference room according to the design drawings, cut out the position of the door and window holes with a cutting machine, install the windows and doors according to the position of the door and window holes, the windows are plastic-steel windows, and the container mobile room leases the bottom of the ceiling.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect