loading

Tailored Camp Solutions to Meet  Custom Needs.

What are the precautions for the operation of light steel villa overhead welding technology

In order to ensure that the welding seam of the light steel villa keel is beautiful, the movement speed of the welding torch should be uniform and the arc height should be stable. For welding the wrist of the gun, if possible, it is better to use the half-kneeling welding method. Support the elbow of the hand holding the welding gun on the knee of the half-kneeling leg. This position is stable when welding, and the welding seam of the light steel villa is stable. The forming is more stable and the structure is firmer. The swinging method of the welding torch during overhead welding of light steel villas is completely different from that of flat welding, but it adopts right-hand welding or welding from far to near. The big problem of single-sided welding and double-sided forming of light steel villa overhead welding is that the back welding bead is concave, which is a common problem of general welders, but with the continuous innovation of Shenlong technology, this defect can be completely avoided by improving the operation technology. . The key to welding the convex bottom bead on the back of the light steel villa keel is to select the welding process parameters and control the height of the arc, so that the arc burns at 1~1.5MM from the top surface of the steel plate, and consciously let part of the arc pass through. Pass over the top surface of the steel plate and burn on the welded bead to obtain a convex rear bead of the overhead welding of the steel structure villa. After the light steel villa is completed, the owner cannot make structural changes on his own, which is different from ordinary concrete buildings, let alone dismantle any bolt component, because it will destroy the overall stability of the house and cannot be added without authorization. Or demolish the wall, if the second modification must be carried out, the company must intervene to adjust the design according to the house structure and then modify it. The exterior walls of light steel villas should be regularly maintained with special paint, and the roof asphalt shingles should be replaced every 5 years according to the actual situation. The structural components of the light steel villa are integrally linked. When the user is setting up the power line, the line cannot be wound on the steel structure body. Line pipes or line isolation grooves should be set up to avoid circuit short-circuits.

We are a performance driven culture that uses pre manufactured homes to ensure continuous improvement.

GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD didn’t receive any negative feedback from our customers before, which proves that customers have faith in us.

If GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD added selling plans, offered more mobile home prices, and increased service regions, it would suit the needs of more users.

Deeper connections between WELLCAMP, WELLCAMP prefab house, WELLCAMP container house and mobile home manufacturersare made when you go beyond the white lights of a corporate space.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
Customer service
detect