loading

Tailored Camp Solutions to Meet  Custom Needs.

What are the measures to prevent the container house from moisture and leakage?

The development of container houses is very fast. Because of their low cost of use, strong stability, and convenient and fast installation and movement, they are widely used in various fields. However, during the long-term use of container houses, there may also be some problems, such as water leakage, In case of moisture, Wellcamp manufacturers will teach you how to prevent moisture and leaks in container houses. Let’s find out together.

First of all, let's introduce the moisture-proof measures of the container house:

First, the horizontal connection between cotton and cotton is closely connected by the method of stapler on the veneer flash;

Second, install the color steel wall panel after the glass is closed;

3. Cut off the glass wool roll felt 20 cm above the purlin on the top of the wall, and fix it with double-sided tape;

Fourth, the veneer faces the indoor side, unwind from the eaves to the corner, and fix the glass roll felt on the bottom purlin with double-sided tape, leaving an extra 20 cm. In addition, during the construction of the container house, according to the needs of the project, in order to avoid the generation of cold bridges, the roof construction can consider padding some hard thermal insulation materials on the purlins. During installation, the tension and alignment of the glass wool roll felt should be maintained, and the joints between rolls should be tight. When longitudinal overlap is required, the overlap should be arranged at the purlin.

Next, let’s talk about a few reasons that may cause the container house to leak:

1. The unreasonable waterproof material used in the re-construction process of the container house or the aging of the waterproof material may cause the container house to leak;

2. During the installation and use of the container house, stepping on the roof may cause the fasteners to loosen, and the aging of the waterproof gasket of the fasteners may cause water leakage at the fasteners;

3. There is no horizontal slope in the gutter of the container house, and the design of the gutter drain is unreasonable. In these cases, the gutter water will not be able to be drained in heavy rain, and the water will return to the gutter in the gutter;

4. During the construction of the container house, the anti-corrosion treatment of the gutter is not in place, resulting in the gutter rusting, or the dregs and garbage block the water outlet, resulting in water backflow or water leakage;

5. The container house is affected by the external weather during use, wind load, snow load, thermal expansion and contraction will cause the roof panel to deform, causing the cracks at the lap joint to expand, and the original waterproof settings are damaged resulting in water leakage.

The above are several reasons why the container houses china leaks. After knowing the reasons that may cause the container house to leak, you can take measures from the root cause to prevent the house from leaking.

Today I talked about some moisture-proof and anti-corrosion measures for container houses. You can refer to them in the process of using container houses, hoping to bring some help for you to better use container houses.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD will continue to build a corporate culture that respects and values the unique strengths and cultural differences of our associates, customers and community.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD seeks to lead the industry by instilling pride in our customers, creating value for the market and sharing responsibility around the world.

mobile home prices is sold in oversees market and has high reputation. Besides, our products are sold with reasonable prices.

You will have a modern manufactured homes that looks pre manufactured homes for sale all the time, Because your is handling with it.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect