loading

Tailored Camp Solutions to Meet  Custom Needs.

What are the layout requirements of the steel structure house structure?

What are the layout requirements of the steel structure house structure? The structural system and structural arrangement of the steel structure house shall meet the relevant requirements of Section 2.3. The steel structure house should adopt the regular construction scheme as far as possible. When the irregular construction scheme is adopted, the seismic joint should be set, and the joint width should not be less than 1.5 times that of the reinforced concrete structure house. Steel structure houses with no more than 12 floors can adopt frame structure, frame-support structure or other structure types; steel structure houses with more than 12 floors should adopt eccentric support, reinforced concrete seismic wall panels with vertical joints, Built-in steel support reinforced concrete wall panels or other energy dissipation supports and cylinder structures. When the frame-support structure is adopted, the arrangement of the support frame in both directions should be basically symmetrical, and the length-to-width ratio of the floor between the support frames should not be greater than 3. The steel structure with no more than 12 floors should be supported by the center. Energy dissipation supports such as eccentric supports can be used. When eccentrically braced frames are used for steel structures with more than 12 storeys, the top layer can be supported centrally. The central support frame should adopt cross bracing, or herringbone bracing or single inclined rod bracing. the width of the piece, and the resulting additional bending moment shall be taken into account. Each support of the eccentric support frame shall have at least one end connected to the frame beam, and form an energy-dissipating beam segment between the intersection of the support and the beam and the column or between the intersection of another support and the beam in the same span.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect