loading

Tailored Camp Solutions to Meet  Custom Needs.

What are the finished product quality acceptance standards for container houses?

Container houses are now widely used in the field of temporary construction. With the continuous improvement of technology and the continuous optimization of box house technology, the container houses produced now can meet the needs of various housing uses. In order to ensure the safety of the house and the service life of the container houses china, there should be a complete set of quality acceptance standards for finished products before leaving the factory. Today Wellcamp manufacturers will take you to find out.

1. Acceptance standard for top frame assembly quality: the paint on the top frame surface should be smooth without pollution, without obvious defects such as sagging, pockmark, inclusion and cracking;

Second, when the ceiling panel is torn off the film, it should be torn clean, the overlapping gap should be uniform, not greater than 1mm, not allowed to be skewed, the nails should not leak, the ceiling panel distribution box should be opened, the explosion-proof box should be opened, and the downpipe should be cut. It cannot be cut on the installed ceiling panel;

3. Acceptance criteria for the assembly quality of the bottom frame: the surface should be clean, there should be no glue marks, the spacing between the self-drilling wires for fixing the cement board should not be greater than 400 mm, the top cap should not be higher than the cement board, and the cement board should not have cracks, falling edges or damage. The joints around the cement board and the ground beams should be uniform. The cement board and the purlin are in close contact and cannot fail. The cement board joints should be smoothed, and the height difference between the adjacent cement boards should not be greater than 0.5 mm. The bonded rubber-plastic floor should not have bulging, wrinkling, peeling and other phenomena. The welding of seam strips shall not be broken or burnt, the welding shall be firm, and there shall be no false welding or false welding;

Fourth, the paint on the surface of the column should be smooth and pollution-free, without sagging and orange peel. The corner pieces should be installed vertically up and down, the foam strip should not be installed beyond the edge of the column, there should be a distance of 2-3mm from the edge of the column, and the overlap should not be dislocated;

5. The installation joints of the wall panels should be tight, the upper and lower joints of the inner wall panels should be tightly connected with screws, and the film should be torn off before installing the wall panels.

The above are the acceptance criteria for the quality of the finished container house. Only by strictly controlling the quality of the house can the comfort and service life of the container house be guaranteed.

Wellcamp is located in Guangdong, China. It is a one-stop service manufacturer integrating design, production, sales, installation and after-sales. Each house will strictly control the quality before leaving the factory to ensure quality and safety. Direct sales, no middlemen make the difference, welcome new and old customers to visit and buy.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD's products, whether interim or permanent, comply fully with all appropriate producing regulations.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD is one of China's biggest providers in the following categories of products: mobile home manufacturers, best manufactured homes, pre manufactured homes for sale,etc. We also welcome ODM and OEM orders, and offer the highest standards of service, the cheapest deals, and the best buying experience. Get to know us at WELLCAMP Prefab-House.

In the boundless Chinese market, there are a number of enterprises that provides luxury manufactured homes new manufactured homes for sale of their own brand over the years, but few have won more support from customers on the international stage than WELLCAMP, WELLCAMP prefab house, WELLCAMP container house.

Knowing what promotions are popular and get the most activity as pre manufactured homes from current and potential customers can play a role in your overall strategy.

Overwhelming customers with too much information or the slew of benefits mobile home prices provides–even if they're all valid–is a surefire way to lose their attention.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect