What are the dangers of the position and vertical deviation of the foundation bolts of the steel structure building?

The position and verticality of the pre-embedded or reserved holes of the foundation bolts of the steel structure building exceeds the allowable deviation value of the specification. The reasons are: the pre-buried anchor bolts (or the pre-buried holes with the plug body are the same) without the use of a fixing frame Fixing, or the rigidity and strength of the fixed frame set are not enough, the concrete pouring is subject to vibration and collision, which causes the displacement and inclination of the anchor bolts; or there is an error in the axis of the foundation construction, or the measurement size is wrong, or the use of a steel ruler has not been verified There is an error; or after the burial is not carefully checked, resulting in a large deviation in position and verticality; or there are errors or errors in design drawings, measurements, operations, etc.; due to the excessive position and verticality of the bolts, it will make the installation of the steel column difficult or installation. Failure to do so, or generating excessive normal stress, will affect the reliable and normal use of the column on the foundation.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect