loading

Tailored Camp Solutions to Meet  Custom Needs.

What are the dangers of the position and vertical deviation of the foundation bolts of the steel structure building?

The position and verticality of the pre-embedded or reserved holes of the foundation bolts of the steel structure building exceeds the allowable deviation value of the specification. The reasons are: the pre-buried anchor bolts (or the pre-buried holes with the plug body are the same) without the use of a fixing frame Fixing, or the rigidity and strength of the fixed frame set are not enough, the concrete pouring is subject to vibration and collision, which causes the displacement and inclination of the anchor bolts; or there is an error in the axis of the foundation construction, or the measurement size is wrong, or the use of a steel ruler has not been verified There is an error; or after the burial is not carefully checked, resulting in a large deviation in position and verticality; or there are errors or errors in design drawings, measurements, operations, etc.; due to the excessive position and verticality of the bolts, it will make the installation of the steel column difficult or installation. Failure to do so, or generating excessive normal stress, will affect the reliable and normal use of the column on the foundation.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service