loading

Tailored Camp Solutions to Meet  Custom Needs.

The process of making steel structure houses in Chongqing

The process of making steel structure houses in Chongqing For my country's construction, the construction of steel structure houses in Chongqing has begun to develop widely. With the continuous improvement of my country's construction level, many construction projects now require attention to installation procedures. The steel structure engineering installation can be divided into one or several installation water sections according to the floor or construction section, and the underground steel structure project can be divided into the flow section according to the existing underground layer. All the steel structure engineering installations in each flow area are completed and inspected. After passing the qualification, the installation work of the next water section can be carried out. The following is the construction sequence summarized by the manufacturer. 1: The installation sequence of the components of the steel structure project should expand from the center to the four sides in the plane, and should be installed gradually from the bottom to the top in the vertical direction. 2: When the main components such as beams, columns, supports, etc. are installed, they should be calibrated immediately after they are in place and fixed during monitoring, and fixed for a long time to form a stable spatial stiffness unit. 3: The welding sequence of the connection of the steel structure construction members should be symmetrically expanded from the middle to the periphery of the plane, the overall shape of the building is well controlled, and the residual stress generated after welding is also small.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service