loading

Tailored Camp Solutions to Meet  Custom Needs.

The advantages of light steel structure villa houses are many

The building's light steel framing consists of 70mm to 100mm thick galvanized cold-formed c-sections in the wall panels and 150mm to 300mm thick c-sections or lattice joists in the floor slabs. The span of 6m can be reached, the internal load-bearing wall can be omitted, so the internal space planning can be flexibly carried out. Precast wall panels are usually floor height (ie 2.7m to 3.2m) and very long up to 8m, depending on transport and hoisting. In some industries, laminate floors supported by light steel walls can be selected. In this case, the floor slab is usually made of section steel, cast-in-place concrete, with a depth of 150mm to 180mm, and is temporarily supported during construction, with a span of up to 5.5m. Not only is it half the weight of a concrete slab, but it is lighter and can be used to lay pipes that hang from the floor. 1. Introduction of steel structure Steel structure house is a kind of steel structure, which has the characteristics of short construction time, low cost and strong practicability. With the increase in my country's steel production, many people began to use steel structures. Steel structures are divided into light steel structures and heavy steel structures. 2. Advantages (1) Simple construction and short construction period All components are prefabricated in the factory, and the on-site installation is simple, which greatly shortens the construction period. The 6,000-square-meter building can basically be installed within 40 days. (2) Durable and easy-to-maintain steel structure of general computer design, which can withstand bad weather and is easy to maintain. (3) Beautiful and practical. The steel structure building is simple, smooth and modern. Colored wall panels come in a variety of colors, and wall panels can also be made from other materials for flexibility. (4) Reasonable cost The steel structure is light in weight, reduces the foundation cost, and the construction speed is fast. It can be put into production as soon as possible. The comprehensive economic benefits are much better than that of concrete structures. Steel structure can save 30% of the cost of steel structure factory.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect