loading

Tailored Camp Solutions to Meet  Custom Needs.

Talk about the characteristics of prefabricated steel structure houses!

(1) Light weight, high strength and good seismic resistance From the perspective of materials, although the quality of steel structures is generally 3.2 times that of ordinary concrete, the strength of steel products can reach more than eight times that of concrete. From the comparative analysis of the stress and strain of steel and concrete, steel has good ductility and uniform internal structure. In earthquakes, steel has good deformation ability, which can resist the impact of earthquakes on building structures, thereby reducing the impact of earthquakes on buildings. degree of damage. (2) The prefabricated steel structure house with high degree of industrialization is the same as other prefabricated buildings. All structural components and parts are standardized in production, construction and installation, and scientific organization and management by mass production in the factory. Change the traditional way of building. (3) The short-construction-period prefabricated steel-structured residences change from 'on-site construction' to 'factory-made' through unified standard production, integrated composite floor slabs, modular components such as columns and walls, and factory-based component production, reducing construction site costs. Environmental and noise pollution, no concrete construction and maintenance period is required on site, and the construction period is only 1/4~1/5 of the traditional building, saving the construction period cost of the building. (4) Green environmental protection and energy saving The amount of construction waste in my country accounts for 30% to 40% of the total waste. It can be seen that the impact of the construction industry on the environment and resources is extremely bad. Compared with traditional buildings, the building materials used in prefabricated steel structure buildings are mainly steel, and the recycling rate of materials is as high as 70%. /4 or so, effectively reducing the impact of construction waste on the environment, in line with the requirements of building energy conservation and environmental protection. (5) Flexible space layout The new lightweight enclosure plate in the assembled steel structure house has large structural space span and flexible layout, which can increase the usable area by 5% to 8%. At the same time, various pipelines can be buried in the wall. In the body and floor structure, the decoration is in place at one time and maintenance is reduced, which can well meet the requirements of the residents. (6) Ease the pressure of excess steel energy In recent years, my country's steel production has continued to increase, although the growth rate has slowed down, but the current situation of oversupply makes steel companies must find another way. At this time, the development of prefabricated steel structure houses can effectively utilize steel, which can not only relieve the pressure of excess steel energy, but also make up for the deficiencies of prefabricated reinforced concrete houses.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect