loading

Tailored Camp Solutions to Meet  Custom Needs.

Take you to understand the production and construction process of the container house

is not limited by climate and environmental conditions, it is an emerging model of prefabricated building that saves manpower and effectively improves building quality. After modular production in the factory, the boxes are directly transported to the construction site for assembly. The boxes also contain basic furniture, and you can move in at any time after the installation is complete! Today Wellcamp container houses china manufacturer will take you to understand the entire production and on-site construction process of the container house:

1. Factory prefabricated construction project

According to the size of the prefab container house, it is produced and assembled in the factory.

1. Wall production: The production process of the wall is completed on the assembly line, including internal insulation and landfilling of hydraulic water pipes. Add the upper layer to the wall panel where the insulation cotton and adhesive are laid, and one wall is completed. The production process for walls with embedded circuits is basically the same as for walls without embedded circuits. The difference, however, is that the lines are preset within the insulation, and then the upper deck is added.

2. The manufacturing process of exterior wall panels and doors and windows is also produced by the factory.

3. In-factory assembly: hoisting and assembly process of exterior wall panels;

4. The production process of interior interior decoration and assembled furniture can be customized together with the box house.

2. On-site construction part

1. Basic part

The foundation construction can be carried out at the same time as the pre-production of the factory. The foundation of the container house generally uses an independent foundation instead of a large area of u200bu200bland reclamation, so it is more convenient and efficient, saving costs and expenses.

2. Assembly and construction of container house:

Transport the container house to the construction site for assembly, use the connecting structure to connect the four groups of boxes, complete the roofing work of the house, carry out the roof construction after the main body is joined, build the roof with a sloping roof, lay waterproof, asphalt, container houses china construction is complete.

From the above introduction, we can see that the container houses china adopts the mode of prefabrication in the early stage and direct installation on site, and basically does not need any foundation. The whole construction process is very convenient and fast, and the time is much lower than other types. Housing, which greatly saves construction time, so container houses are now widely used in various fields, and have become a new generation of environmentally friendly and economical houses.

Collectively, the effect of mobile home prices on industrial society has been to eliminate best manufactured homes and drastically reduce the time long associated with cheap manufactured homes.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD strives to reflect the highest ethical standards in our relationships with members, providers, and shareholders.

Choose the right platform for selling mobile home manufacturers and we'll reach the right customers. But if we have the right idea in the wrong platform, that still adds up to the wrong idea.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
Customer service
detect