loading

Tailored Camp Solutions to Meet  Custom Needs.

Steel structure holiday products, steel structure holiday house manufacturers, steel structure holiday homestays (design, construction)

The construction requirements of steel structure houses are already very strict. Sometimes because of the tight construction period and rainy weather, we have to carry out construction. In order to ensure the quality and efficient completion of the work, the following precautions should be observed during construction in rainy days: 1. During construction in rainy days, a temporary protective shed should be erected to prevent rainwater from falling on the hot welding seam. Clean with a cloth and dry with an oxyacetylene flame prior to welding to keep the joints dry and free of residual moisture. 2. When hoisting, if there is water on the components, it should be cleaned before installation, but the coating should not be damaged. When installing high-strength bolt joints, the friction surface of the components should be clean, and there should be no water droplets, let alone rain and contact with soil and oil. etc. Dirt. 3. Rainy weather components cannot be painted. 4. In rainy days and strong winds above level 5, roof insulation construction cannot be carried out. 5. In rainy days, because the air is relatively humid, the electrode should be stored in moisture-proof and baked. The same electrode should not be repeatedly baked more than twice, and the management personnel should make a baking record in time. 6. In case of strong winds, large components such as columns, main beams, and supports should be corrected immediately, and fixed immediately after the correct position correction to prevent unilateral instability. The components installed on the day should form a spatial stability system. 7. If the foundation is soaked by rain, necessary work such as excavation and backfilling should be done to restore the bearing capacity of the foundation; important or special projects should be completed before the rainy season. The earthwork backfilled before the rain should be rolled in time to form a certain slope on the surface, so that the rainwater can be automatically discharged. 8. It is strictly forbidden to operate electrical equipment outdoors in rainy days or in places with water. Small accessories such as drilling holes can be made indoors in rainy days. For electrical circuits and electrical equipment, all aspects of inspection and maintenance should be carried out to ensure the safety of electricity use. Mobile homestay hotels, non-standard accommodation, RV camps, Internet celebrity restaurants, bookstore mobile clothing stores, mobile laundry rooms, mobile car dealerships, mobile bars, mobile vending stores, mobile offices, mobile cafes, mobile service stations, mobile Products such as studios, prefabricated toilets, mobile information centers, mobile medical rooms, mobile showrooms and pop-up stores.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect