loading

Tailored Camp Solutions to Meet  Custom Needs.

Steel structure holiday products, steel structure holiday house manufacturers, steel structure holiday homestays (design, construction)

The construction requirements of steel structure houses are already very strict. Sometimes because of the tight construction period and rainy weather, we have to carry out construction. In order to ensure the quality and efficient completion of the work, the following precautions should be observed during construction in rainy days: 1. During construction in rainy days, a temporary protective shed should be erected to prevent rainwater from falling on the hot welding seam. Clean with a cloth and dry with an oxyacetylene flame prior to welding to keep the joints dry and free of residual moisture. 2. When hoisting, if there is water on the components, it should be cleaned before installation, but the coating should not be damaged. When installing high-strength bolt joints, the friction surface of the components should be clean, and there should be no water droplets, let alone rain and contact with soil and oil. etc. Dirt. 3. Rainy weather components cannot be painted. 4. In rainy days and strong winds above level 5, roof insulation construction cannot be carried out. 5. In rainy days, because the air is relatively humid, the electrode should be stored in moisture-proof and baked. The same electrode should not be repeatedly baked more than twice, and the management personnel should make a baking record in time. 6. In case of strong winds, large components such as columns, main beams, and supports should be corrected immediately, and fixed immediately after the correct position correction to prevent unilateral instability. The components installed on the day should form a spatial stability system. 7. If the foundation is soaked by rain, necessary work such as excavation and backfilling should be done to restore the bearing capacity of the foundation; important or special projects should be completed before the rainy season. The earthwork backfilled before the rain should be rolled in time to form a certain slope on the surface, so that the rainwater can be automatically discharged. 8. It is strictly forbidden to operate electrical equipment outdoors in rainy days or in places with water. Small accessories such as drilling holes can be made indoors in rainy days. For electrical circuits and electrical equipment, all aspects of inspection and maintenance should be carried out to ensure the safety of electricity use. Mobile homestay hotels, non-standard accommodation, RV camps, Internet celebrity restaurants, bookstore mobile clothing stores, mobile laundry rooms, mobile car dealerships, mobile bars, mobile vending stores, mobile offices, mobile cafes, mobile service stations, mobile Products such as studios, prefabricated toilets, mobile information centers, mobile medical rooms, mobile showrooms and pop-up stores.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service