loading

Tailored Camp Solutions to Meet  Custom Needs.

Special container material transportation and pre-installation care, inventory, and repair

Special container material transportation and pre-installation care, inventory, and repair. About material transportation 1. Check the road conditions and choose a good transportation route. 2. The transportation of materials should be carried out in a complete set according to the installation sequence. 3. Different transportation methods should be selected for different components. For example, windows, doors, and herringbone should be placed upright, separated by non-metallic materials, and the hardware should be staggered. 4. The components should be handled with care, and should not be picked up and placed in sequence by prying, shaking, or dropping. 5. Load the vehicle carefully, bind reasonably and firmly, keep it clean, and prevent the vehicle from damaging the components due to vibration. 6. During transportation, storage and construction of components, measures should be taken to prevent damage, deformation, and loss. Regarding pre-installation care, inventory, and repair 1. After the materials enter the site, special personnel should be assigned to guard them to prevent loss. 2. Before installation, the components should be carefully counted according to the component list of the board room, and the names, specifications, and quantities of the missing components should be reported in time; the deformed or painted components should be repaired in time; the oil, mud, sand, dust, etc. on the surface of the object should be repaired in time Clean up debris in time. 3. Acceptance of the foundation According to the basic conditions of the board house provided, the board house foundation shall be checked and accepted. Main contents: concrete strength, foundation elevation, top surface flatness, foundation width, geometric dimensions.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect