Special container material transportation and pre-installation care, inventory, and repair

Special container material transportation and pre-installation care, inventory, and repair. About material transportation 1. Check the road conditions and choose a good transportation route. 2. The transportation of materials should be carried out in a complete set according to the installation sequence. 3. Different transportation methods should be selected for different components. For example, windows, doors, and herringbone should be placed upright, separated by non-metallic materials, and the hardware should be staggered. 4. The components should be handled with care, and should not be picked up and placed in sequence by prying, shaking, or dropping. 5. Load the vehicle carefully, bind reasonably and firmly, keep it clean, and prevent the vehicle from damaging the components due to vibration. 6. During transportation, storage and construction of components, measures should be taken to prevent damage, deformation, and loss. Regarding pre-installation care, inventory, and repair 1. After the materials enter the site, special personnel should be assigned to guard them to prevent loss. 2. Before installation, the components should be carefully counted according to the component list of the board room, and the names, specifications, and quantities of the missing components should be reported in time; the deformed or painted components should be repaired in time; the oil, mud, sand, dust, etc. on the surface of the object should be repaired in time Clean up debris in time. 3. Acceptance of the foundation According to the basic conditions of the board house provided, the board house foundation shall be checked and accepted. Main contents: concrete strength, foundation elevation, top surface flatness, foundation width, geometric dimensions.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
Customer service
detect