Safety and precautions for fire-resistant container houses

Fire-proof residential container is a kind of steel structure board house. Now many board houses also use light steel keel as the main structure, so the use of steel structure in the construction industry is becoming more and more extensive. Today, the editor will mainly tell you about the hoisting method of steel structures, and understand the details of on-site construction of hoisting, such as on-site management, hoisting point selection and crane station selection, which are all important points in hoisting construction.

Safety and precautions for fire-resistant container houses

(1) Site and road treatment of the hoisting construction site: After the backfilling of the foundation works, a site with a width of 6-7m must be set aside 1.0m from the axis of the building as a road for cranes to travel, and the foundation is required to be solid and able to withstand the weight of the cranes. , in order to ensure the safety of hoisting machinery and hoisting operations.

(2) The hoisting adopts the backward hoisting.

(3) Selection of hoisting points: For the hoisting of steel columns, due to the small height of the steel columns, less than 16 meters, one or two hoisting can be used: for the hoisting of steel beams, two points are used when the length of the hoisting steel beam is less than 20 meters. When the length of the lifting steel beam is more than 20 meters, the four-point method is used for hoisting.

(4) Selection of crane station: The lifting capacity of the crane station must be guaranteed to meet the hoisting of components.

(5) Check calculation of the hoisting component body: Before the component body is hoisted, the construction check calculation of the body component should be carried out in terms of strength and stability to ensure that the body hoisting is feasible.

GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD outfits our businesses with mobile home prices because they're relatively affordable and highly customizable.

To receive more professional tips and super quality products for modern manufactured homes, go to our website WELLCAMP Prefab-House to place your order. Do not wait any longer.

Even new manufactured homes for sale are being made fine with advanced equipment.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect