Sort | Name | Specification |
Size | Length | 76.61m |
Width | 18.76m | |
Height | 6m | |
Total area | 1437.2m2 | |
Steel structure | Column | "H" section steel |
Beam | "H" section steel | |
Purlin | “C” section steel | |
Panel | Wall panel | 0.426mm single steel sheet |
Roof panel | 0.426mm single steel sheet | |
Accessories | Window | 1200*925 aluminum sliding window |
Door | Electric roller door |
This steel structure building is for the warehouse in the Uganda.Ventilation balls are installed for the air on the top of the warehouse.
Against the water come inside and keep safe, the customer build 1.2 meter brick wall before install the wall panel.
◪1.Strong “H”section steel and “C” section steel for the structure. |
◪2.Single steel sheet or sandwich panel for the wall & roof. |
◪3.Normally requires cement foundation of 600mm at least. |
◪ 4.Brick or concrete wall of height from 1m to 2m are suggested for better water proofing performance before installing prefabricated wall panels. |
◪ 5.All the steel structure is painted and anti-rust which can be normally used for more than 30 years without any building wastes. |
◪ 6.Easy to build. The building is connected by bolts and screws. 6 labors one team, each day can install 300 square meter. |
Material parameters
Main steel:"H" section steell for column&beam;
Wall panel:0.426mm single steel sheet;
Roof panel:0.426mm single steel sheet;
Window:Aluminum sliding window;
Door:Electric roller door;
ridge capping:0.426mm single steel sheet.
Wind resistance: | Grade 11 |
Earthquake resistance: | Grade 7 |
Snow load capacity of roofing: | 0.6 kn/m2 |
Live load capacity of roofing: | 0.6 kn/m2 |
External and internal wall heat transmission coefficient: | 0.35 kcal/m2hc |
Wall permitted loading: | 0.6 kn/m2 |
Wall and roof panel: | EPS/IEPS/ROCK WOOL/PU |
Thickness of the wall and roof: | 50mm/75mm/100mm |
Delivery time: | Normally 20-25 days |
Container loading(50mm): | 900m2/HQ |
This workshop can be used as the dormitory,office,school,canteen,store room,shop,clinic and so on, The materials of the house is very environment friendly. It can be assemed and disassemed for six times. More information about it, welcome to contact us.