Basic Information
This prefab homes project located at Saudi Arabia is a big labor camp project.
According to the customer’s request, we send our international installation team to local for
installation guidance, lasting about half year.
Project Overview
Time: 2016
Location: Saudi Arabia
Type: prefab homes accommodation
Area: 6300 m²
Challenges & Solution:
1. Tropical desert climate
is the main factor that increased the difficulties of the project. Saudi
Arabia is hot and dry. So we adopted hot and dry resistance sandwich panel, rock
wool sandwich panel, for wall and roof.
2. Due to the short construction period and the large covered area, we design the uniform fabrication and load the materials set by set to reduce the time cost as much as possible.
Details:
STEEL: C
section steel
ROOF: 50mm rock wool sandwich panel
WALL: 50mm rock wool sandwich panel
DOOR: IEPS sandwich panel door
WINDOW: Aluminium alloy sliding window
FLOOR: Cement board