Precautions for the safe use of container prefabs

With the vigorous development of mobile homes, more and more people use mobile homes. However, many friends who are new to this new type of house do not know much about it, and they are afraid that this new type of house is not very secure in terms of safety. This article will introduce to you that as long as the prefabricated house is designed and used, there will be no problem. For the specific introduction of how to ensure quality and safety during design, please see the following.

Precautions for the safe use of container prefabs

1. If the prefabricated house is made of polystyrene as the sandwich panel, then attention should be paid to fire prevention.

Electric welding should not be carried out near the wall, fireproof devices should be installed on heating stoves in winter, and metal pipes should be used for indoor wiring.

The metal pipe should be grounded reliably or the refractory material pipe should be used for protection when passing through the wall. It is strictly forbidden to use a blowtorch on the roof that needs to be waterproofed.

When the roof tile iron sheet is less than 0.6 mm in the open area, the house should be equipped with a lightning rod.

2. Pay attention to wind protection. The prefab house is light in weight, simple in structure and weak in wind resistance. In order to improve the wind resistance, please try to choose the prefabricated house from a regular manufacturer, and don't just pay attention to the cheap price and leave troubles.

For the prefab house that has been installed without wind resistance, the customer can use the drill tail wire to fix it on the roof along the length of the prefabricated house above the front and rear walls 4×4 angle steel and other measures to remedy.

3. Light steel structure houses should pay attention to the size of the purlins not too small. After the construction is completed, the connection and reinforcement of each part should be checked.

GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD is devoted to satisfy our customers with a wide array of the finest using experience.

Excellent quality yet affordable best at WELLCAMP Prefab-House. Don't miss out!

By building an connection around WELLCAMP, WELLCAMP prefab house, WELLCAMP container house and catering specifically to the craft beer crowd, GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD was able to raise the capital and brand awareness needed to successfully break into the domestic market with a groundswell of support.

Many homeowners find that they can cut costs while keeping home cool efficiently with .

GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD are used to coming up with solutions while think about problems, also expressing the whole idea individually.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service