loading

Tailored Camp Solutions to Meet  Custom Needs.

Precautions for steel structure installation

Precautions for steel structure installation: 1. Torque coefficient: where d is the nominal diameter of the high-strength bolt (mm), M is the applied torque value (N﹒M), and P is the bolt preload. Grade 10.9 high-strength hexagonal bolt connections must ensure that the average torque coefficient K is 0.110 to 0.150. Its standard deviation should be less than or equal to 0.010. 2. Final tightening torque: the final tightening torque of the high-strength bolt is the final tightening torque. Considering the loss of various prestresses, the final torque is generally 5% to 10% larger than the theoretically calculated torque value based on the design pretension. 3. Friction coefficient: where F is the force that causes the initial slip of the specimen measured by the anti-slip test, nf is the number of friction surfaces, and is the sum of the measured values ​​of the high-strength bolt tightening pretension corresponding to F. 4. Initial tightening torque: In order to reduce the influence of the deformation of the steel plate during the bolt tightening process, secondary tightening can be used to reduce the mutual influence between successively tightened bolts. The high-strength bolts should be screwed for the first time, so that their axial force should reach 60% to 80% of the standard axial force.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service