loading

Tailored Camp Solutions to Meet  Custom Needs.

Notice! This is a common problem with the waterproof quality of steel structure workshops!

Now is the era of transformation from traditional brick and concrete workshops to steel structure workshops. The construction period of brick-concrete workshop is long and the cost is high, while the steel structure workshop has outstanding advantages, such as wide range of uses, simple construction, durability, beautiful and practical, reasonable cost, etc. Therefore, a large number of enterprises choose steel structure workshop. However, due to construction, aging of the roof, industrial pollution, weather factors, and acid rain in Chongqing, the water leakage of the steel structure workshop is more serious. The steel structure workshop waterproofing project is a systematic management project. Any problems in the design, materials, construction, governance, maintenance, etc., will affect the quality of the entire project. If leakage occurs, it may damage the equipment in the plant. In order to avoid unnecessary losses, if there is leakage on the surface of the steel structure factory, a high degree of attention must be paid. The editor of Chongqing steel structure workshop has made the following analysis on the common quality problems of waterproof engineering of steel structure workshop based on years of practice of waterproof engineering of steel structure workshop. Common problems and analysis of waterproof engineering 1. Structural problems of steel structure workshop a. The large temperature difference between day and night in Chongqing may cause the color steel tile of the steel structure workshop to expand and shrink, resulting in rivet falling off and color steel tile dislocation; b. Color steel tile density difference and poor quality , it will cause local cracking of the roof color steel tile, damage the waterproof layer, and cause roof leakage; 2. Leakage of the waterproof layer of the coating A, the moisture content of the coating is greater than 9%. B. When the base layer treatment agent is painted, the brushing is not in place, and the paint is not brushed into the pores on the surface of the base layer as much as possible, so that a large amount of dust and other inorganic impurities left by the base layer are mixed with the paint to cause shelling. C. I did not paint in accordance with the principle of 'high first, then low, first far and then near'. D. There is no strict control of the thickness of the waterproof coating layer, the thickness of the sub-coating and the interval time. E. The protective layer construction is not carried out as soon as possible after the coating film is applied. F. The additional layer is an important measure to ensure the waterproof quality. Before large-scale construction, no additional layer is made on the details of the water drop, pipe root, yin and yang corners. 3. Problems between the rigid protective layer and the waterproof layer There is no isolation layer between the rigid protective layer and the waterproof layer, and there is even an intention to increase the bonding between the waterproof layer and the rigid protective layer. Due to the deformation, shrinkage and cracking of the rigid protective layer, the waterproof layer is damaged by stretching and extrusion. 4. Improper construction of roof corners When the horizontal inner corners such as the color steel tile roof and parapet wall follow the old method to make large round corners, the consequences of the fillet radius reaching 200-300mm: ①. Waste materials and increase roof load; ②. Structural board Stress deformation and dry shrinkage of base mortar lead to easy cracking of large fillet base and structural board, tearing the waterproof layer; 3. It is more difficult to construct the corner of the brick-concrete factory building; 5. The downpipe and the gutter are blocked a. Strictly prevent debris from falling into the pipeline; b. The slope load of the downspout exceeds the requirements, resulting in backwatering of water; c. The gutter is not cleaned regularly, and the drainage is not smooth, resulting in stagnant water; d. The gutter grows grass and moss, and the drainage is not good. smooth, resulting in water leakage.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect