loading

Tailored Camp Solutions to Meet  Custom Needs.

NEWS

Welcome to Wellcamp News Center. We will share you the Latest News.

Our news including Company Dynamic,New Product Release,Houses Promotion, Holiday Blessing and Prefab house industry Dynamic.

Thank you for your attention to Wellcamp and Wellcamp Products all the way. 

How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
2026 10 12
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
2026 10 07
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
2026 10 05
How to Plan a Mining Camp in Indonesia: Site Selection, Workforce and Camp Layout
Learn how to plan a mining camp in Indonesia, from site selection and workforce accommodation to drainage, HSE, utilities, camp layout and future expansion.
2026 09 30
Modular Mountain & Forest Resort Development: Designing With Terrain, Not Against It | WELLCAMP
Plan a mountain or forest resort with factory-built modular cabins. Triangular Villa, Mountain House, L-Type Villa. 10-14 weeks deployment, terrain-adaptive, snow-load rated.
2026 09 18
How to Plan a Mining Camp Layout for Modular Facilities?

Plan a mining camp layout around dormitories, offices, canteens, toilets, recreation, circulation, and workforce capacity.
2026 09 15
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
2026 09 14
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
2026 09 11
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
2026 09 10
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
2026 09 09
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
2026 09 08
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
2026 09 01
Customer service