loading

Tailored Camp Solutions to Meet  Custom Needs.

Movable B&B hotels, non-standard accommodation, RV campsites, Internet celebrity restaurants (design, construction)21

The steel structure house should be designed with a single slope, and the drainage direction should not be directed towards the main structure. Attention should be paid to the connection between the outer wall of the main structure and the roof of the roof. Make sure that the outer wall of the main structure is drained smoothly without leakage. As a sub-structure, the span of the hut is generally smaller than that of the main structure, and it is usually hinged with the main structure, as shown in (Fig. 1); Relevant regulations fully consider the effect of snow accumulation at the connection between the hut and the main structure; for the main rigid frame column connected with the hut, the adverse effect of the shear force generated by the hut should be fully considered in the design. In the design, some people think that since the hut is a sub-structure, the sub-structure (the simply supported beam between the two cantilever beams) can be separated from the main structure (the cantilevered beam on both sides of the simply supported beam) like a multi-span statically indeterminate beam. To calculate, in fact, these two situations are different: one is a statically indeterminate structure, the other is a statically indeterminate structure, the load acts on the main structure of the multi-span statically indeterminate beam, does not affect the deflection and internal force of the substructure, only The displacement and internal force of the main structure can only be affected by the load acting on the substructure, so the displacement and internal force of the substructure can be calculated first, and then the influence of the substructure on the displacement and internal force of the main structure can be considered; while the load (vertical load or horizontal load) ) acting on the main structure (super statically indeterminate structure) of a single-storey portal rigid-frame house with a draped house will affect the displacement and internal force of the substructure (draped house), therefore, regardless of whether the load acts on the main structure or on the On the sub-structure, they should be analyzed and calculated as a whole. Regarding the snow pile effect at the connection between the hut and the main structure, Paragraph 5 of 'Code for Loading of Building Structures': 'Generally, there is wind vortex effect on the high and low roof, snow piles The accumulation of curve figures is often formed. The 'Code for Loading of Building Structures' simplifies it as a snowdrift with a rectangular distribution. In the heavy snow in Liaoning in March 2007, the seriousness of the snow pile effect problem has been fully explained; in addition, there is a problem of skiing effect from a high place to a low place, and there is no corresponding calculation formula given in the Chinese regulations. , should be fully paid attention to in the design. Mobile homestay hotels, non-standard accommodation, RV camps, Internet celebrity restaurants, bookstore mobile clothing stores, mobile laundry rooms, mobile car dealers, mobile bars, mobile vending shops, mobile offices, mobile Products such as cafes, mobile service stations, mobile studios, mobile hotels, mobile information centers, mobile medical rooms, mobile showrooms and pop-up stores.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect