loading

Tailored Camp Solutions to Meet  Custom Needs.

Lightweight wall and roof design of light steel structure house!

Come and learn the knowledge points about the lightweight wall and roof design of light steel structure houses. 1. According to the principles of adapting measures to local conditions, adapting measures to local conditions, selecting materials, optimizing combinations, and combining, lightweight walls and roofs should adopt cement-based prefabricated lightweight composite insulation materials, warm strips, light steel frames, and bone materials with reliable performance and reliable supporting technology. Composite insulation, warm walls, aerated concrete, concrete slabs, lightweight blocks and other lightweight materials. 2. It should be selected according to the requirements of thermal insulation or thermal insulation. Lightweight shell materials with appropriate density and thickness should be selected. Meet the limited requirements for sound insulation and fire rods of buildings 3. External wall insulation panels should be installed within the overall external steel structure. When in use, fill the outer wall of the steel frame, and the exposed steel structure parts should be well insulated, thermally insulated and treated. 4. When using lightweight wall panels, the wall, wall, outer wall and wall should be in the form of double-layer hollow, the inner layer is embedded in the steel frame, the outer layer is wrapped and hung, and the steel structure is hung inside and outside. 5. When the light steel keel and the combined wall are used, the light steel keel of the outer wall should be a small square steel pipe truss structure. When cold-formed thin-walled c-section steel keels are used, they should be staggered in double rows to form broken bridges. The light steel keel composite wall should meet the following requirements: (1) For the exterior wall, the outer side of the keel main body should be aligned with the main steel frame, and the outer wall insulation material should be covered with steel plates; (2) For the light steel keel composite wall, it should be Condensation check calculation 6. When using lightweight block walls, the outer wall masonry should be wrapped with steel structure blocks and steel and tension structures, otherwise, the steel structure should be thermally insulated and treated. 7. Lightweight walls and roofs should take anti-crack, moisture-proof and rain-proof measures, and should maintain thermal insulation and dry materials. Durable and reliable. 9. The overlapping parts on the outer wall, such as terraces, awnings, outdoor air conditioning panels, etc., should be insulated and treated. 10. On the walls of reserved or slotted places, reinforcement, measures should be taken, sound insulation and thermal insulation should be used. Otherwise, there must be reliable construction measures to prevent wind and snow. 12. The roof and board surface are suitable, and the cement-based lightweight composite thermal insulation board, thermal insulation board, and board edge should be used. There should be joints splicing, and the splicing should be firm and reliable. 13. When the roof is thermally insulated, the system should be thermally insulated from the outer wall, and the system should be continuously and closely connected. 14. When the roof is thermally insulated, the system should be covered with purlins, and there should be thermal insulation and measures for the roof, cornices, steel picks, and components. When indoor ceiling insulation, thermal insulation, roof, system, ventilation should be provided between roof and ceiling.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect