loading

Tailored Camp Solutions to Meet  Custom Needs.

Jiangsu Provincial Department of Housing and Urban-Rural Development actively promotes assembly and decoration work

In order to speed up the promotion and application of prefabricated decoration and improve the living comfort of the people, on September 29, Liu Dawei, deputy director of the Jiangsu Provincial Department of Housing and Urban-Rural Development, and his party went to relevant enterprises to conduct research on prefabricated decoration design and product development. Huang Hui, director of the Nanjing Municipal Construction Committee, and comrades in charge of the Science and Technology Department and Design Department of the Department participated in the investigation. Liu Dawei and his party listened to the report on the development of prefabricated decoration, and checked the supporting products and model room display of prefabricated decoration on the spot. During the investigation, Liu Dawei fully affirmed the staged achievements in the development of prefabricated decoration in the province. He demanded that it is necessary to further increase the research and development of related technologies and products, improve the standard system, actively carry out the construction of pilot demonstration projects, accelerate the promotion of prefabricated decoration in prefabricated buildings, and effectively improve the sense of acquisition and satisfaction of the people. It is reported that in recent years, the Department of Housing and Urban-Rural Development of Jiangsu Province has attached great importance to the promotion of prefabricated decoration, organized the compilation of the local standard 'Technical Standard of Prefabricated Decoration', and guided the backbone enterprises in the field of decoration and decoration in the province to focus on suitable technologies and products to increase research and development and market. development efforts.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect