loading

Tailored Camp Solutions to Meet  Custom Needs.

Is the light steel villa strong? Will people stand on it and sink? -wellcamp light steel villa manufacturers

Take you to see the big villa, the stability of the light steel villa of simple life is beyond imagination, and the data confirms how strong it is! In the subconscious of many people, being heavy means being practical. Therefore, the appearance of light steel structure villas has changed many people's cognition. I think if a lot of people standing on the second floor will sink, will it really be like that? Today, let's analyze it in several aspects and uncover its secrets! The floor bearing capacity is large, and the live load index value of the general civil housing is 200kg/square meter, and the light steel structure villa can far meet the housing load requirements. Since the raw materials of light steel type are all made by factory processing, the structure of the light steel structure villa is very compact. A large villa built with light steel structure basically has tens of thousands of structural parts to The error of each structural part should not be less than 2 mm, so as to ensure the load-bearing capacity of the light steel structure, which is also impossible to achieve with brick-concrete structure raw materials. The floors of light steel structure villas are generally composed of cold-formed thin-walled steel frames or composite beams, floor OSB structural panels, supports, connectors, etc. The raw materials used are oriented strand board, cement fiber board, and plywood, which can carry a weight of 316-365Kg per square meter on the light steel structure floor, and many people on the second floor or above do not have to worry about collapse. , because its bearing capacity is better than that of traditional houses, not only that, the weight of the floor structure standard system of light steel structure houses is only 1/4-1/6 of the domestic traditional concrete floor standard system, but its floor The structural height of the face will be 0.1-0.12 meters higher than the ordinary concrete slab. Roof load is strong. To verify the bearing capacity of the light steel structure villa roof, it is necessary to mention the snow load of the light steel structure house. If the blizzard is approaching, will the light steel structure house be crushed? Snow load is a professional term in engineering and construction, which refers to the snow pressure acting on the top surface of buildings or structures, that is, the gravity of snow acting on buildings. The key lies in the depth of snow and the unit volume weight of snow. The value of the snow load will be directly related to how much snow our house can carry, which is known as the last straw that crushes the building. In terms of architectural design, the snow load on the roof is clearly stipulated in my country. The design of civil buildings generally takes 50 years as a cycle time. In the local 50 years, according to the detection of the weather station, the snowfall encountered is relatively large. quantity as a benchmark. Snow load is actually a probabilistic analysis, and the snow load varies from region to region. The Northeast region needs more consideration. In addition, the shape and position of the flat roof, sloping roof, and corner of the building are different, and the snow load to be considered is also different. In the corner and the place where snow is easy to accumulate, the load should be considered relatively high. In severe cold areas, the common snow load is relatively large. For example, the snow load in some areas in Northeast China and Xinjiang is above 0.7 kN/square meter, while the snow load in the southern region is generally lower, generally below 0.5 kN/square meter. Snow loads do not need to be taken into account (0.1 kN equals 10 kg). A variety of factors affecting the safety and reliability of light steel structures, such as load, raw material performance, structural quality differences, imperfect calculation models, etc., are random, so the ability of engineering structures to complete predetermined functions can only be measured by probability. When carrying out structural design, multiply the snow load of 0.6 kN/m2 by a factor of 1.4, and divide the limit of the bearing capacity of steel members by a factor greater than 1, and the latter data must be greater than the former. Facts have proved that light steel structure houses will not be crushed by blizzards. Its snow load even far exceeds that of traditional buildings.

It has become necessary for GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD to continually cultivate, develop and update their skills to work successfully alongside high-tech.

Exceed customers' expectations in the procedures of manufacturing pre manufactured homes.

By building an connection around WELLCAMP, WELLCAMP prefab house, WELLCAMP container house and catering specifically to the craft beer crowd, GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD was able to raise the capital and brand awareness needed to successfully break into the domestic market with a groundswell of support.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect