loading

Tailored Camp Solutions to Meet  Custom Needs.

Introduction to Chongqing Steel Structure Plus Welding Technology

Introduction to Chongqing Steel Structure and Layer Welding Technology With the continuous growth of the economy, people's quality of life continues to improve, and the demand for the quality of the environment and construction projects also continues to increase. The welding technology of engineering steel structure is also constantly developing. Steel structure engineering should choose appropriate welding process, plane welding, vertical welding, horizontal welding, overhead welding, etc., short arc welding, the arc length is usually 2-4mm. Weld seam cleaning: Check the parts for damage and vacancy, and the weld seam must not be oily or rusted. When baking electrodes, they must meet the specified temperature and time. Remove the electrode from the oven and store it in the electrode. Choose the appropriate welding current according to the welding level, electrode type, diameter, thickness, welding process and other factors. Welding speed: constant speed welding is required to ensure uniform thickness and width. The cast iron and slag of the molten pool should be equidistant (2-3mm) from the inside of the mask. Welding is determined by different types of electrodes. The welding angle is usually the angle between the electrode and the welding direction is 60-75, and the other is the angle between the electrode and the left and right sides of the welding. Each weld is welded to the end of the filler arc, and after the crater, the arc should be applied in the opposite direction to the welding direction so that the arc crater is in the weld bead. At the end of the welding, gas cut the bent plate and smooth it out. The maturity and development of steel structure and layer engineering welding technology will speed up the development of China's steel structure engineering. Welding technology is very important for the future prospects of steel structure engineering. Steel houses are urban recyclable structures. Not only can it be recycled and reused, it can also reduce the emission of construction waste, it can also promote the industrialization of houses, and improve and improve parts. Compared with developed countries, there are great differences in the ecological composition of steel structures in China. In developed countries such as the United States and Japan, steel structure steel structure accounts for more than 30% of steel production, and steel structure accounts for more than 40% of the total construction area. In China, the steel used for steel structure is less than 6%, and the area of ​​steel structure is less than 5% of the total construction area. Steel structure and floor At present, the building structure in China is mainly composed of reinforced concrete and stone structure, which is the main source of building energy consumption. The low data recovery rate of reinforced concrete and brick structures constitutes a huge waste of resources. After the structure is removed, a large amount of waste is generated, which is expensive to dispose of. In the whole life cycle, the steel structure has large scrap metal resources, becoming the second mining industry, improving the production capacity of the steel industry, and completing the circular economy, energy saving and environmental protection. Steel structures have excellent seismic performance and can reduce earthquakes. greeting. Casualties and property losses have become places of temporary exile, and post-disaster reconstruction costs are low, and industrial production can also be carried out within a short construction period to ensure the quality and construction period of construction projects.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect