loading

Tailored Camp Solutions to Meet  Custom Needs.

How to solve the problem of keeping warm in residential containers?

The temperature in winter in our country is generally low, and traditional houses cannot keep warm. In order to keep out the cold, every family has come up with various methods. However, the emergence of Wellcamp living containers has solved this problem and made winter no longer cold. For example, there will be many problems in the furnace in the house. If the coal is burned in winter, there are still potential safety risks. Because of the improper use of the burning appliance, many cases of carbon monoxide poisoning occur every year. In addition, it is particularly troublesome to make a fire frequently, and when it is cloudy, the whole village is often shrouded in a cloud of smoke. The living container has very good thermal insulation performance, because its design is safe and livable, and it contains thermal insulation layer and thermal insulation layer to avoid thermal bridge phenomenon. The house is very warm in winter and very cool in summer, real do the warm in winter and cool in summer. In most areas, it can be basically achieved that there is no stove in winter and no air conditioner in summer. The removable container movable house is an improvement on the movable board house. The Roof, four walls and the floor can be removed as parts respectively and assembled when necessary. This kind of container movable house is better than movable board house, which is a little cheaper than the fixed type of freight. The installation is faster than the movable board house, but it is not as fast as the fixed type of welding, firmness is between welded fixed container movable house and movable board house. The living container also has very good shock resistance, because he chooses light steel keel as the load-bearing structure of the house. The steel structure house has good toughness and ductility, can withstand earthquakes of magnitude 8 or above, and is very safe and practical. In addition, the construction speed of residential containers is also very fast. A 200 ㎡ building can be completed in only a few weeks, because besides the foundation, the materials needed for the integrated House are all transported to the site after the factory is produced and assembled like assembling a car, which not only reduces the construction difficulty, but also controls the quality of the house well.

We are a performance driven culture that uses new manufactured homes for sale to ensure continuous improvement.

Our vision serves as the framework for our mobile home manufacturers and guides every aspect of our business by describing what we need to accomplish in order to continue achieving sustainable, quality growth.

Even pre manufactured homes are being made fine with advanced equipment.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service