loading

Tailored Camp Solutions to Meet  Custom Needs.

How to prevent dampness in residential container houses in summer

The container house is a new type of mobile house, the introduction of modern home design concept, the use of steel, sandwich panels, aluminum alloy, ceramic tiles, glass, paint and other materials refined into an integrated mobile house after standard process, with ready-to-use Ready to use, move anywhere, anytime and anywhere recycling, recycling, environmental protection, beautiful, economical, fast, and other features. Therefore, the product has been sought after by the market as soon as it is launched, and it can be said to be the successor to the traditional prefabricated house. Moisture resistance is a major problem in mobile homes. Because some of them are cotton sandwiches, the problem of moisture resistance must be solved well. In fact, a good moisture-proof effect should rely on the construction of the wall of the mobile home. Therefore, the following points are put forward for the shortcomings of the mobile room: 1. The horizontal connection of cotton and cotton is connected by the method of stapler binding on the veneer flash. 2. Close the glass wool edge and install the wall color steel plate; 3. Cut off the glass wool roll felt 20 cm beyond the wall * purlin, and fix it with double-sided tape. 4. The veneer faces the indoor side, unwind the roll from the eaves to the corner, and use double-sided tape to fix the glass roll mat on the purlin at the * lower end, leaving an extra 20 cm. In addition, according to the project needs when constructing the mobile house, In order to avoid cold bridges, the roof construction can consider putting some hard thermal insulation materials on the purlins. When installing, keep the tension and alignment of the glass wool roll felt tight, and the joints between the rolls should be tight. When longitudinal laps are needed, the lap joints should be arranged at the purlins. The moisture-proof problem of the above mobile homes will be solved, and the mobile homes will be more comfortable and accepted by the wider masses. Note 1. According to the needs of the project, in order to avoid the generation of cold bridges, some hard insulation materials can be considered in the roof construction. 2. Keep the tension and alignment of the glass wool roll felt tightly during installation, and the joints between rolls and rolls are tight. When longitudinal laps are needed, the lap joints should be arranged at the purlins. The residential container frame consists of four columns. The upper and lower beams and the floor beams are all made of channel steel. The walls and ceilings are made of color steel sandwich panels. The floor is laid with ceramic tiles. Double-open convection push-pull aluminum alloy glass windows, stainless steel anti-theft nets, Various living facilities such as water, electricity, air-conditioning racks are in place.

In an age when new manufactured homes for sale is increasingly important, the researchers believe manufacturers should pay close attention to their results.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD works hard to enhance continuously our reputation for accessibility, professionalism, performance, and the depth and quality of our long-term consultative relationships with clients.

As the full potential of luxury manufactured homes lies in , the demand for is increasing globally, and is being adopted across the global market.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service