loading

Tailored Camp Solutions to Meet  Custom Needs.

How to improve the loading rate of sea containers? - Container house Wellcamp - professional container production

Shipping containers have become an indispensable tool in modern transportation, but when many companies load goods, the actual container space utilization rate is not high, which will cause a waste of space and increase the cost of renting containers. So how can you improve the loading rate of sea containers? 1. Combination method of stacking When loading goods in shipping containers, the most important factor in determining the actual utilization rate of container loading is which way to place the goods. It can be divided into horizontal, vertical, side, lying, Adjacent objects are placed next to each other, freely combined and placed. In practical applications, the less the placement requirements are, the more they can be placed. Therefore, if the goods have no special placement needs, use them as much as possible. Combination of various forms. 2. Reasonably designed stacking layers When loading shipping containers, without considering the overweight of the cargo and the load-bearing capacity of the container, the more layers of cargo stacking, the more cargo will be loaded, but each container All have rated loading weight, so the stacking layer should be calculated according to the self-weight of the goods, and try to stack as many layers as possible without overweight. 3. Calculate the size of the cargo gap. Even if it is a high-quality shipping container, when transporting fragile goods, pay attention to the stacking gap to avoid collision with each other and cause the cargo to be broken. However, the size of the gap will directly affect the loading rate of the container, so when packing, the size of the gap must be carefully calculated to ensure that the goods will not move because of the too large gap, and at the same time, it will not be too small to put fillers . As long as the above four aspects are achieved, the loading rate of sea containers can be fully improved. Since the weight that each best-selling shipping container can carry is rated, it is necessary to pay close attention to its maximum carrying capacity while making efficient use of space, and be careful not to exceed the specified maximum limit, otherwise the freight will increase. risk.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service