loading

Tailored Camp Solutions to Meet  Custom Needs.

How to effectively prevent moisture in the resident mobile room

Moisture-proof is a major problem in the movable room. Because some of them are made of cotton cores, the problem of moisture-proof must be solved well. In fact, a good moisture-proof effect should be built on the wall of the movable room. Therefore, the relevant experts put forward the following points for attention in view of this shortcoming of the mobile house:

How to effectively prevent moisture in the resident mobile room

1. Close the glass wool and install the color steel plate on the wall;

2. With the veneer facing the indoor side, unwind from the eaves to the corner of the wall, and use double-sided tape to fix the glass roll felt on the bottom purlin, leaving an extra 20 cm;

3. The horizontal connection of cotton and cotton is connected together by the method of binding with a stapler on the veneer flash.

4. Cut off the glass wool roll felt 20 cm above the purlin on the top of the wall, and fix it with double-sided tape.

In addition, according to the needs of the project during the construction of the mobile house, in order to avoid the occurrence of cold bridges, the roof construction can consider padding some hard thermal insulation materials on the purlins.

During installation, the tension and alignment of the glass wool roll felt should be maintained, and the joints between rolls should be tight. When longitudinal overlap is required, the overlap should be arranged at the purlin.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
Customer service
detect