loading

Tailored Camp Solutions to Meet  Custom Needs.

How to effectively prevent moisture in the resident mobile room

Moisture-proof is a major problem in the movable room. Because some of them are made of cotton cores, the problem of moisture-proof must be solved well. In fact, a good moisture-proof effect should be built on the wall of the movable room. Therefore, the relevant experts put forward the following points for attention in view of this shortcoming of the mobile house:

How to effectively prevent moisture in the resident mobile room

1. Close the glass wool and install the color steel plate on the wall;

2. With the veneer facing the indoor side, unwind from the eaves to the corner of the wall, and use double-sided tape to fix the glass roll felt on the bottom purlin, leaving an extra 20 cm;

3. The horizontal connection of cotton and cotton is connected together by the method of binding with a stapler on the veneer flash.

4. Cut off the glass wool roll felt 20 cm above the purlin on the top of the wall, and fix it with double-sided tape.

In addition, according to the needs of the project during the construction of the mobile house, in order to avoid the occurrence of cold bridges, the roof construction can consider padding some hard thermal insulation materials on the purlins.

During installation, the tension and alignment of the glass wool roll felt should be maintained, and the joints between rolls should be tight. When longitudinal overlap is required, the overlap should be arranged at the purlin.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect