How to do moisture-proof treatment of container houses

There is no horizontal slope in the gutter of the container house, and the design of the gutter downhole is unreasonable. In the event of heavy rain, the gutter water can not be discharged to the gutter and return water to the gutter; The gutter is rusted and eroded, or there are scum and other conditions such as clogging the drain, which can cause water leakage or water backflow.

How to do moisture-proof treatment of container houses

1. The horizontal connection of cotton and cotton is connected together by the method of binding with a stapler on the veneer flash.

2. Close the glass wool and install the color steel plate on the wall;

3. Cut off the glass wool roll felt 20 cm above the purlin on the top of the wall, and fix it with double-sided tape.

4. The veneer is facing the indoor side, unwind from the eaves to the corner, and fix the glass roll felt on the bottom purlin with double-sided tape, leaving an extra 20 cm.

Speaking of this, the editor reminds that the container houses china should be constructed according to the needs of the project. In order to avoid the occurrence of cold bridges, some hard insulation materials can be considered on the purlins for roof construction. During installation, the tension and alignment of the glass wool roll felt should be maintained, and the joints between rolls should be tight. When longitudinal overlap is required, the overlap should be arranged at the purlin.

GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD have long believed that management practices are an important element in productivity.

Visit GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD for the best in supplies: WELLCAMP Prefab-House.

GUANGDONG WELLCAMP BUILDING MATERIALS CO., LTD believes that the shorter the path between consumer and product, the more likely businesses are to convert more sales.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect