loading

Tailored Camp Solutions to Meet  Custom Needs.

How should the thermal insulation measures of the container house be done?

is a new type of movable environmental protection building, which is widely used in today's society. Because the container house belongs to the metal structure and the thermal conductivity is relatively large, the thermal insulation transformation measures should be carried out for the container house. There are generally three situations for the renovation of container houses, thermal insulation inside the box and thermal insulation outside the box. So what exactly should be done? Today Wellcamp manufacturers will take you to find out.

1. Thermal insulation inside the box

When using internal insulation treatment, the transformation of the box can be carried out inside the factory. The outside of the box is a solid metal structure, and there are still hoisting holes, which is convenient for hoisting and transportation, and is not easy to cause damage to the insulation layer. Since the container house needs to be recycled and transported frequently, the following matters should be paid attention to during the thermal insulation treatment:

1. Under the same circumstances, choose thinner insulation materials;

2. Select insulation materials that meet the requirements of safety and environmental protection;

3. For different parts, choose the corresponding insulation measures.

Second, heat preservation treatment on the outside of the box

The exterior of the container house, after thermal insulation and thermal insulation treatment measures, is applied to the exterior treatment of the box structure, and other decorative materials are used to cover the external overall building. Usually, the construction of thermal insulation and external decorative surfaces needs to be carried out after the overall assembly of the house is completed. The specific construction details are the same as those of the external thermal insulation materials commonly used in steel structure buildings. During the construction process, the external thermal insulation treatment of the container was used, and the external thermal insulation construction was carried out after the container was transported and assembled in place.

The above are the specific measures for thermal insulation of container houses. You can refer to them. I hope today's article can bring you some help. If you have any questions or needs about container houses, please feel free to consult Wellcamp manufacturers. We will provide you with satisfactory solutions with our rich production experience.

Service-based companies as Guangdong WELLCAMP BUILDING MATERIALS CO., LTD are increasingly becoming more popular internationally.

If you would like to learn more about best manufactured homes mobile home prices, and other types, please be sure to visit WELLCAMP Prefab-House. We can offer you top quality as well as cost saving price.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD has never compromised on the quality and the services provided to the customer.

The above are only part of the examples regarding mobile home manufacturers, for more information, please click here WELLCAMP Prefab-House.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service