loading

Tailored Camp Solutions to Meet  Custom Needs.

How much do you know about the light steel villa foundation system?

1. Light steel villa foundation system It can adopt various forms such as strip foundation, crawl space, basement, etc., mainly strip foundation. The depth of the double-storey house is 400mm-600mm deep under the ground, and the structural ring beam with a height of 240mm-300mm is set above the ground. The specific construction geological conditions and the house foundation design shall prevail. Light steel structure houses are light in weight, only about one-fifth of brick-concrete structure houses and one-eighth of reinforced concrete structure houses, so the cost of foundation construction can be greatly reduced. Light steel structure houses generally use strip foundations. . 2. Silicon calcium board for the inner substrate of the wall system; OSB board (9.5mm) for the structural board is imported from Canada; the outer decorative layer can be cement fiber hanging board/local cultural stone/American paint; the thickness of the outer wall is generally 120-200mm; The walls are relatively thin, and the actual use area of ​​light steel structure houses is increased by about 10%-15% compared with traditional houses; the indoor use area of ​​light steel structure houses is more than 90%, the indoor space can be flexibly separated, and pipelines can be installed on the walls and floors. The layout of the holes reserved for the roof construction is good in concealment and more beautiful. Key points: The wall is thin, the weight is light, the housing area is large, and the appearance is beautiful. Three: Light steel villa floor system The floor system is mainly truss type, the light steel beam height is 305mm, and it is assembled by standard small rods. A 18mm thick OSB structural board is laid on the floor beam, and a 40mm thick lightweight concrete cushion (crack-resistant sound insulation layer) is set on the top. The floor decoration layer can choose wood floor, ceramic tile or carpet, etc. The floor is made of high-strength hot-dip galvanized C-shaped and U-shaped light steel components. The floor beams are arranged with dense ribs at equal intervals according to the standard modulus. The floor beams are covered with structural plates that have undergone strict moisture-proof and anti-corrosion treatment to form a solid Earthquake resistant floor system. Key points: Anti-seismic, sound insulation, the floor is tightly seamed, and anti-leakage. Four: Light steel villa roof system Roof trusses are assembled from various light steel components, generally including triangular roof trusses and T-shaped roof trusses. Various complex roof shapes can be easily and flexibly realized. Generally, colorful asphalt shingles are used for roofing, which has excellent waterproof function and highlights the beauty and quality. Light steel composite roof truss, filled with 2*100mm glass fiber wool, 9mm OSB structural board, (in some areas with heavy wind pressure and snow load, 12mm OSB structural board is used), and the top of the structural board is waterproof and painted. Asphalt shingles are used for roofing tiles. The castle can use glazed tiles and Spanish terracotta tiles. Key points: The roof is beautiful and generous, with strong bearing capacity, and can withstand snow loads of more than 1.55KN/㎡.

is a modern new manufactured homes for sale widely used in best manufactured homes industry. It also enhances the quality pre manufactured homes for sale value of the products.

If you are interested in any of mobile home manufacturers, please feel free to contact us.

As consumers get more and better information regarding how to compare various products and companies, it is critical to compete on the price and value of mobile home prices.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service