loading

Tailored Camp Solutions to Meet  Custom Needs.

Design scheme of multi-storey light steel structure house in Chongqing

First of all, the floors of multi-storey light steel structure houses need to have sufficient bearing capacity, stiffness and integrity. At present, it is more common to put the special-shaped steel plate on the steel beam, and then cast the reinforced concrete slab of 100-150mm, that is, the laminated steel plate composite plate, the special-shaped steel plate and the steel beam. Connected by stud bolts. In addition, prestressed slabs can be used to add cast-in-place concrete or ordinary reinforced concrete slabs. In this case, a reliable connection between the slab and the steel beam should be ensured. Considering the combination of steel beam and flat plate in the design process, the bearing capacity and overall stability of the beam can be significantly improved, and the height of the beam can be effectively reduced. The connection between the main beam and the secondary beam is usually a simple support connection, and sometimes it is also made into a connection of unequal height. For example, when laminated steel sheets are used, the thicknesses of the primary and secondary beams are different. At the same time, it can also increase the clear height of the building. The protective structure of the multi-storey light steel structure house is to reduce the self-weight of the multi-storey light steel structure house, and the light structure is used for the envelope structure. The outer walls are mainly made of lightweight filling materials such as hollow bricks and aerated concrete. Sometimes composite walls made of pressed steel and lightweight insulation are used, and many exterior walls of the house are both light and aesthetically pleasing. Glass curtain wall. structure. The inner dividing wall can be made of light-filled walls, such as hollow brick or aerated concrete or light steel keel plasterboard. Currently, it is separated by an aluminum framed glass.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect