loading

Tailored Camp Solutions to Meet  Custom Needs.

Design scheme of multi-storey light steel structure house in Chongqing

First of all, the floors of multi-storey light steel structure houses need to have sufficient bearing capacity, stiffness and integrity. At present, it is more common to put the special-shaped steel plate on the steel beam, and then cast the reinforced concrete slab of 100-150mm, that is, the laminated steel plate composite plate, the special-shaped steel plate and the steel beam. Connected by stud bolts. In addition, prestressed slabs can be used to add cast-in-place concrete or ordinary reinforced concrete slabs. In this case, a reliable connection between the slab and the steel beam should be ensured. Considering the combination of steel beam and flat plate in the design process, the bearing capacity and overall stability of the beam can be significantly improved, and the height of the beam can be effectively reduced. The connection between the main beam and the secondary beam is usually a simple support connection, and sometimes it is also made into a connection of unequal height. For example, when laminated steel sheets are used, the thicknesses of the primary and secondary beams are different. At the same time, it can also increase the clear height of the building. The protective structure of the multi-storey light steel structure house is to reduce the self-weight of the multi-storey light steel structure house, and the light structure is used for the envelope structure. The outer walls are mainly made of lightweight filling materials such as hollow bricks and aerated concrete. Sometimes composite walls made of pressed steel and lightweight insulation are used, and many exterior walls of the house are both light and aesthetically pleasing. Glass curtain wall. structure. The inner dividing wall can be made of light-filled walls, such as hollow brick or aerated concrete or light steel keel plasterboard. Currently, it is separated by an aluminum framed glass.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
How Safe Is Your Mining Camp? Fire Ratings, Climate Adaptation & Energy Efficiency Explained | WELLCAMP
Are modular mining camps fire-resistant, weatherproof & eco-friendly? How long does erection take? WELLCAMP answers 15 technical FAQs on safety, energy, climate adaptation & warranty.
How to Build a Mining Camp That Works: Design, Accommodation, Office & Full Facility FAQ
What does a complete mining camp include? WELLCAMP answers 15 FAQs on camp design, accommodation, offices, kitchens, medical clinics, laundry & turnkey solutions. Global delivery, 20 years' experience.
Mess Karyawan Sawit: Solusi Kamp Perkebunan Turnkey untuk Pabrik Kelapa Sawit Indonesia
Mess karyawan sawit modular untuk perkebunan Kalimantan & Sumatera. RSPO-compliant, tahan rayap & gempa. 90-120 hari serah terima. Harga pabrik langsung. Hubungi WELLCAMP.
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
Customer service
detect