loading

Tailored Camp Solutions to Meet  Custom Needs.

Container houses are used in different places

Nowadays, various container houses appear and are widely used in different places. Container office is like this. The construction process of container office 1. Construction process release-excavation of foundation trough-C15 concrete foundation ground beam and Ground concrete cushion construction-ground beam installation-column installation-floor in-line beam system installation-walkway system installation-exterior wall panel installation-window installation-door installation-canopy system installation- Roofing system installation—internal partition board installation—PVC ceiling—clean site—completion acceptance 2. Construction requirements 1. Gray line stakeout: Measure according to the location of the living area plan. Residential container components The installation position of each component should meet the design requirements, and the location of the on-site welding parts should be accurate, and there should be no false welding or missing welding. Fasteners a. Fasteners should meet the requirements of GB5782. b. Bolts should be installed in the correct position and gaskets should be installed according to the design requirements. There should be no missing or missing installation. C. The connecting bolts between components need to be tightened. Paint a. The place where the primer peels off during on-site welding and transportation should be repainted with a layer of anti-rust paint. b. The exposed parts of the components shall be painted with a second layer of topcoat. The paint shall not have the phenomenon of missing brushing, peeling, hanging paint and returning rust. Wall a. Rank the container office and the wall to the top according to the layout plan, and need to be corrected. The corners and external corners of the umbrella wall are sealed with angle aluminum. The connection between the board and the board is made of I-shaped aluminum. Each wall must Vertical, uniform caulking depth, neat and clean, the wall should be clean, the color should be the same, the board seam should be neat, the nailing surface should be consistent up and down, and there should be no misalignment, and the necessary parts should use self-tapping bolts. b. Mark the position of the doors and windows of the container meeting room according to the design drawings, cut out the position of the door and window holes with a cutting machine, install the windows and doors according to the position of the door and window holes, and the windows are plastic steel windows.

Owing to its modern manufactured homes and cheap manufactured homes benefits, has become a buzzword in the best manufactured homes market.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD’s mission is to be the leading global innovator, developer and provider of pre manufactured homes luxury manufactured homes products, systems, and services.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD have significantly changed the way customers approach manufacturing. mobile home prices can still compete if we are willing to change the ways in producing.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect