loading

Tailored Camp Solutions to Meet  Custom Needs.

Container houses are used in different places

Nowadays, various container houses appear and are widely used in different places. Container office is like this. The construction process of container office 1. Construction process release-excavation of foundation trough-C15 concrete foundation ground beam and Ground concrete cushion construction-ground beam installation-column installation-floor in-line beam system installation-walkway system installation-exterior wall panel installation-window installation-door installation-canopy system installation- Roofing system installation—internal partition board installation—PVC ceiling—clean site—completion acceptance 2. Construction requirements 1. Gray line stakeout: Measure according to the location of the living area plan. Residential container components The installation position of each component should meet the design requirements, and the location of the on-site welding parts should be accurate, and there should be no false welding or missing welding. Fasteners a. Fasteners should meet the requirements of GB5782. b. Bolts should be installed in the correct position and gaskets should be installed according to the design requirements. There should be no missing or missing installation. C. The connecting bolts between components need to be tightened. Paint a. The place where the primer peels off during on-site welding and transportation should be repainted with a layer of anti-rust paint. b. The exposed parts of the components shall be painted with a second layer of topcoat. The paint shall not have the phenomenon of missing brushing, peeling, hanging paint and returning rust. Wall a. Rank the container office and the wall to the top according to the layout plan, and need to be corrected. The corners and external corners of the umbrella wall are sealed with angle aluminum. The connection between the board and the board is made of I-shaped aluminum. Each wall must Vertical, uniform caulking depth, neat and clean, the wall should be clean, the color should be the same, the board seam should be neat, the nailing surface should be consistent up and down, and there should be no misalignment, and the necessary parts should use self-tapping bolts. b. Mark the position of the doors and windows of the container meeting room according to the design drawings, cut out the position of the door and window holes with a cutting machine, install the windows and doors according to the position of the door and window holes, and the windows are plastic steel windows.

Owing to its modern manufactured homes and cheap manufactured homes benefits, has become a buzzword in the best manufactured homes market.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD’s mission is to be the leading global innovator, developer and provider of pre manufactured homes luxury manufactured homes products, systems, and services.

Guangdong WELLCAMP BUILDING MATERIALS CO., LTD have significantly changed the way customers approach manufacturing. mobile home prices can still compete if we are willing to change the ways in producing.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect