Construction sequence of steel structure houses in Chongqing

Construction sequence of steel structure houses in Chongqing For Chinese buildings, the construction of steel structure houses in Chongqing has begun to be widely carried out. With the continuous improvement of China's construction level, the installation procedures of many facilities should be paid attention to. According to the floor or building area, the steel structure installation can be divided into one or more installation process segments. Underground steel structure engineering can be divided into watersheds according to the underground floors. All steel projects in each watershed have been installed and approved. Once certified, primary water supply components can be installed. 1. The installation sequence of steel structure engineering components should extend from the middle of the plane to the periphery, and gradually install from bottom to top in the vertical direction. 2. When installing main components such as beams, columns, brackets, etc., calibration and monitoring must be performed immediately after fixing the position, and fixed to form a stable spatial stiffness device. 3. The welding sequence of steel structure engineering member nodes should extend symmetrically from the middle to the periphery, so that the overall shape of the building can be well controlled, and the residual stress generated after welding should also be small.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service