Construction process of light steel structure houses and villas in Chongqing

Light steel structure villa construction process At present, light steel structure villas should solve problems as soon as possible according to design and product standards. The combination of light steel structure houses and villas is a temporary building. According to the national standard 'Uniform Standard for Reliability Design of Building Structures' GB50068-2001, the design period of the modular house is 5 years. The structure must meet functional requirements for safety, applicability and durability over the specified design life. In addition to the design calculations required to ensure the required reliability of the building structure, the properties of materials, quality of the building, use and maintenance must be monitored accordingly. The specific control requirements must meet the special requirements of the relevant design and construction standards. The installation process of the light steel structure villa: Bulk material: The steel structure material is directly installed on the site of the truck crane. Bulk materials along the crane route approaching the lifting point; Bay: The steel lifting rod uses an 8T truck crane; the anchor rod must achieve strength and precision before lifting the rebar. TEMPERATURE RANGE The steel column is raised and placed vertically at one point, multiple points (long column), and then temporarily fixed and fixed from the main center line to the level. Light steel lifting beam steel structure house villa structure 1 The roof steel beam has been separated. The steel beam is a 4-point belt. Before lifting, connection points must be identified and tested to ensure stability. 2 When installing and lifting steel beams, ropes must be installed at both ends to fix the beams of the frame in the air. After installation, cables must be temporarily secured on both sides to support the installation and support.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Does a Modular Construction Manufacturer Control Quality? Inside WELLCAMP's Full-Chain QC System
Modular building quality control from material inspection to pre-shipment checks. See how WELLCAMP inspects steel structures, panels, electrical systems, and packing before dispatch.
What Should You Confirm Before Signing a Mining Camp Contract?
Mining camp quotation, permits, turnkey scope, EPC roles, contract terms, Bahasa Indonesia documents. 7 commercial FAQs for Indonesian mining camp projects.
Modular Mining Camp Building Installation, Maintenance & Relocation | WELLCAMP
How modular mining camp installation, quality control, maintenance and relocation in Indonesia. Explore WELLCAMP prefab houses and container houses for remote mining sites.
Prefab Office Buildings for Mining Camps: Benefits, Costs, Sizes and Layout Options
Planning offices for a remote mine? See how prefab office buildings work, which sizes fit, smart layouts and what really drives prefab office cost.
How WELLCAMP Qualifies Suppliers Before They Enter Your Project Supply Chain
Discover how WELLCAMP investigates, evaluates, audits and qualifies suppliers to control quality, supply reliability and project risk for large-scale modular building projects.
How to Design a Complete Mining Camp: Accommodation, Facilities and Modular Buildings
How to plan a complete mining camp, from worker accommodation and management offices to dining, sanitation, medical facilities and modular building selection.
Indonesia Mining Camp Logistics: From China to Remote Mine Sites
Learn how Indonesia mining camp logistics works from China to remote mine sites, including ports, customs, inter-island transfer, final-mile delivery and unloading.
Mining Camp Engineering in Indonesia: Foundations, Drainage, Water, Power and Climate
Learn how mining camp engineering in Indonesia addresses foundations, drainage, water, wastewater, power, tropical climate, corrosion, wind and seismic conditions.
Customer service