loading

Tailored Camp Solutions to Meet  Custom Needs.

Construction process and precautions of container office

The container office is similar to the construction of a building. The surroundings and the foundation of the partition wall are leveled, and reinforced concrete is used to be relatively strong. Then erect the pillars and connect the frame with transverse beams, top partitions, exterior wall panels, and door and window frames; then lay the floor, and then install a layer, then top the roof truss and roof panel; install doors and windows, etc., and pull the vertical supports. There are sanitary ware, small hardware and the like. Construction requirements 1. Gray line stakeout: Measure according to the location of the floor plan of the living area. 1) Residential container components The installation position of each component should meet the design requirements, and the location of the on-site welding parts should be accurate, and there should be no false welding or missing welding. 2) Fasteners a. Fasteners should meet the requirements of GB5782. b. The bolts should be installed in the correct position and gaskets should be installed according to the design requirements. There should be no missing or missing installation. C. The connecting bolts between the components should be tightened. 3) Paint a. The place where the primer peels off during on-site welding and transportation should be painted with a layer of anti-rust paint. b. The exposed parts of the components should be painted with a second layer of top paint. The paint shall not have the phenomenon of missing brushing, peeling, hanging paint and returning rust. 4) Wall a. Correct the container office and wall according to the layout plan. The corners and external corners of the umbrella wall are sealed with angle aluminum. The connection between the plates and the plates is made of I-shaped aluminum, and the walls must be vertical. The caulking depth should be the same, neat and clean, the wall should be clean, the color should be the same, the board seam should be neat, the nailing surface should be consistent up and down, and there should be no misalignment, and the necessary parts should use self-tapping bolts. b. Mark the position of the doors and windows of the container conference room according to the design drawings, cut out the position of the door and window holes with a cutting machine, install the windows and doors according to the position of the door and window holes, the windows are plastic-steel windows, and the container mobile room leases the bottom of the ceiling.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect