loading

Tailored Camp Solutions to Meet  Custom Needs.

Common sense about how to do hydropower installation in steel structure villas?

Common sense about how to do hydropower installation in steel structure villas? 1. First installation and positioning Before construction, you should be familiar with the circuit drawings, and mark them with a marker on the wall according to the position and height marked by the sockets and switches on the drawings. 2. Reinforcement production First measure the width of the position where the bottom box needs to be installed, then draw a 4 cm connection at both ends of the C-shaped steel, extend it to the side, cut off the excess part, and fix the cut C-shaped steel on the wall. , install the U-shaped steel on the C-shaped steel to complete the reinforcement. 3. Install the bottom box Fix the corresponding number of bottom boxes on the reinforcement according to the requirements of the drawing. If more than two bottom boxes are installed, the bottom box connections must be fastened. 4. Drilling line holes After the bottom box is installed, the construction personnel install the hand drill on the D25 hole opener, and open the corresponding line pipe holes at the top beam directly above the bottom box. Open 2 holes in the floor beam position above the socket, and open 3 holes in the switch. 5. After the pipe through hole is opened, carry out the construction of the wiring pipe. The pipe layout should be carried out in an orderly manner, and the construction should be carried out in accordance with the loop sequence, so as to be horizontal and vertical. Reinforce both ends. 6. Pipe bends When using a cold bender pipe bender, place the section that needs to be bent above the knee and press down slowly to make the bending angle larger for threading. 7. Threading After the wire pipe is completed, start the threading work. The threading starts from the power distribution box, and is passed from the front to the back. No leakage occurs. Note that the socket must be wired with a ground wire.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
From Factory to Remote Mine: How WELLCAMP Delivered a Turnkey Detachable Camp Solution in DR Congo

WELLCAMP delivered a turnkey detachable camp solution for a remote mine in DR Congo—500 workers, single supplier, under 120 days. Factory-direct pricing, global shipping, 20 years' experience.
Modular Construction for a Net-Zero Future: Green Building Solutions for Indonesia's IKN and Energy Sector

Sustainable modular housing for IKN & East Kalimantan energy projects. WELLCAMP answers 6 FAQs on green building costs, LEED certification, carbon footprint & tropical energy efficiency.
Eid Al-Adha Mubarak 2026! Heartfelt Wishes from GUANGDONG WELLCAMP GROUP
Celebrating Dedication and Prosperity: Eid Al-Adha 2026 Wishes from WELLCAMP
Container Houses & Prefab Camps for East Kalimantan: How to Choose and Combine the Right Modular Systems — WELLCAMP 2026 Guide
Detachable, flat pack, or foldable? WELLCAMP compares modular camp types for East Kalimantan—anti-corrosion steel, typhoon-rated, 25-year lifespan. Choose the right prefab house.
Serbia Cold Climate Project | WELLCAMP Flat Pack Container House Solution
WELLCAMP Cold-Climate Modular Solutions We deliver custom flat pack container houses engineered for extreme cold. Featuring 100mm rock wool insulation, a 200mm glass wool ceiling, and triple-glazed windows, our buildings ensure superior thermal efficiency, lower energy costs, and year-round indoor comfort for remote projects.
Geliga-1 Discovery 2026: Why East Kalimantan's Oil & Gas Boom Makes Modular Camps Urgent for IKN
Geliga-1 gas discovery in Kutei Basin fuels IKN worker accommodation crisis. Modular camps and site offices—fast, relocatable, built for East Kalimantan.
Inside the WELLCAMP Factory: Precision Engineering & The Power of Automatic Powder Coating

Explore WELLCAMP 100,000 m²manufacturing hub featuring YASKAWA robotic welding, a high-performance automatic powder coating line, and precision steel structure packaging.
Detachable Container House: The Fast, Permanent Modular Office Building Solution
WELLCAMP Container Office is a 2-storey detachable container house for mining camps, construction sites & oil field offices. 90% factory pre-assembled, ships globally, assembles in 2 weeks on site, and engineered with galvanized steel & 80μm coating to last 25 years. Visit our factory or get a quote via WhatsApp.
Customer service
detect