loading

Tailored Camp Solutions to Meet  Custom Needs.

Classification of alloy structural steel

According to the carbon content, alloy structural steel is divided into low carbon alloy steel, medium carbon alloy steel and high carbon alloy steel. According to the strength, alloy structural steel is divided into general strength steel, high strength steel and ultra-high strength steel. But the definition of high-strength steel and ultra-high-strength steel is not clear. The fastener industry generally believes that high strength means that the tensile strength is not less than 104OMPa (that is, above 10.9), and most of them are obtained by quenching and tempering or isothermal quenching and tempering to obtain a sorbite structure. Comprehensive mechanical properties such as good plasticity and toughness, high fatigue strength and low cold-brittle transition temperature. Ultra-high-strength steel refers to steel with a nominal tensile strength of not less than 1470MPa. Generally, tempered martensitic structure is obtained by quenching and low-temperature tempering or bainite structure is obtained by isothermal quenching. It has high strength, fatigue resistance and suitable toughness. The choice of material form mainly considers the processing technology. Low-carbon alloy steel and riveting screw steel have good cold deformation plasticity, and are mainly formed by cold emblem, so coiled material should be selected; medium carbon alloy steel and ultra-high-strength steel have poor cold deformation plasticity, and cold tenderness is difficult, mainly hot tender. And mechanical processing is the main, it is more suitable to choose the bar. Storage requirements: Alloy steel has poor corrosion resistance without protection. During storage, avoid rain, keep humidity less than 75%, and temperature between 5°C and 35°C. When there is no coating on the surface, Anti-rust oil needs to be applied and checked every year. If the anti-rust oil evaporates, it needs to be repainted.

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How to Plan Turnkey Mining Camp Accommodation for 300 Workers

Plan turnkey mining camp accommodation for 300 workers in extreme climates, from dormitories and snow loads to utilities, logistics, and phasing.
How to Choose Mining Camp Accommodation for Remote Workers?

Plan mining camp accommodation around workforce size, climate, transport limits, installation resources, and long-term cost.
Remote Mining Camp Requirements: A Practical Guide

Remote mining camp requirements for EPC and mining teams covering capacity, facilities, utilities, and safety to plan remote mine accommodation.
Modular Beach Resort: Maximize Oceanfront Revenue with Prefab Villas | WELLCAMP
Modular beach villas designed for oceanfront revenue. Seaside Two-Story Villa + Apple Cabin, coastal-grade corrosion protection, 10-14 weeks deployment. Open before peak season.
Modular Glamping Resort: Complete Development Guide for Resort Developers | WELLCAMP

Plan a glamping resort with factory-built modular cabins. Apple Cabin + Triangular Villa, 10-14 weeks deployment, phased expansion. Full resort accommodation system from one supplier.
Industri Sawit dan Pertambangan Indonesia: Kebutuhan Kamp Modular di Tengah Ekspansi Industri

Kamp modular untuk perkebunan sawit & tambang di Indonesia. Mess karyawan, kantor, gudang—panel rockwool tahan api, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sulawesi, Maluku. 20 tahun pengalaman.
Bangunan Modular Tahan Api untuk Perkebunan Sawit: Solusi Karhutla & Kepatuhan ISPO | WELLCAMP

Karhutla mengancam perkebunan sawit saat kemarau. WELLCAMP hadirkan bangunan modular tahan api: mess karyawan, kantor, gudang. Panel rockwool Kelas A, sesuai ISPO/RSPO. Kirim ke Riau, Kalimantan, Sumatera.
Gempa 7,7 SR Flores: Solusi Shelter Darurat Cepat Pasang | WELLCAMP Indonesia
Gempa 7,7 SR guncang Flores. WELLCAMP sediakan shelter darurat korban gempa: rumah kontainer lipat 4 menit, expandable tanpa derek & Gable Mining Lodge. Tahan gempa 8+. Stok siap kirim.
Terremoto de 7.4M en Colombia: Soluciones Modulares WELLCAMP para Reconstrucción Rápida Post-Sismo
Terremoto de 7.4M sacude Chocó, Colombia. WELLCAMP ofrece refugios plegables (4 min), casas expandibles y viviendas modulares provisionales para reconstrucción post-sismo. 20 años de experiencia. Inventario listo.
Customer service
detect