At a mine in the Andes Mountains of South America, a client faced a challenge: the mine was remote and the environment was harsh, with thousands of miners about to move in. How could they provide them with a safe and comfortable living and working camp in a short period of time?
The client's biggest concerns were time and the environment—"Can the equipment be transported over the rugged mountain roads? Can the project be completed on schedule?"
WELLCAMP's corporate identity is "Quick Response, Total Customer Service." On the first day of the project, we established a dedicated team, with design, production, logistics, and engineering staff fully engaged. We maintained a 24/7 communication mechanism to ensure prompt responses to any client questions.
Project Plan
Based on the mine's terrain and usage requirements, we customized a modular Mining Camp solution for the client:
Folding Container House: Reduces shipping volume by half, making it suitable for long-distance mountain transport;
Flat Pack Container House: Suitable for accommodation, including dormitories, cafeterias, offices, and bathrooms;
Reinforcement and insulation design: Designed to withstand the high altitude, large temperature swings between day and night, and severe sandstorms.
Loading and Shipping
Due to the tight construction schedule, our factory adopted an assembly line approach to accelerate production, while also assigning dedicated personnel to quality inspection to ensure 100% qualified product before shipment.
During the loading phase, the team pre-designed the optimal loading plan, fully utilizing the container space and improving transportation efficiency by over 20%. We also employed a stacked loading and rolling shipment strategy: while the first batch departed, the second batch was already in production, and the third batch was undergoing testing and preparation for loading. Even clients overseas could monitor progress at any time through real-time photos and video monitoring.
Installation
Upon arrival of the materials at the mine site, our engineers immediately flew to the site to assist the local team with construction.
Against the strong winds and dusty conditions of the plateau, we persevered, working day and night, resolving any issues within the same day. Daily progress and results were promptly provided to the client, ensuring a transparent and efficient project.
In just 50 days, a modern mining camp capable of accommodating thousands of miners was completed:
Dormitories: neat and comfortable, equipped with ventilation and insulation;
Canteen: spacious and bright, accommodating hundreds of people;
Office and meeting areas: efficient and practical;
Living facilities: bathrooms, medical room, and storage.
Project Achievements
When the client walked into the completed mining camp, they exclaimed, "In such a challenging environment, you not only ensured speed but also quality."
The workers were also heartfelt: "Finally, in the desolate mining area, they have a living environment that feels like home."
WELLCAMP once again demonstrated its strength:
No matter how complex the environment or how daunting the challenge,
Our entire staff serves our clients promptly and efficiently, ensuring the best possible Mining Camp from design to implementation.
Contact: Siwen Chen
Tel: +86 13902808995
E-mail: siwenchen@chinawellcamp.com
Address: Unit 804, 8th Floor, Block A, 115 Jihua 4th Road, Chancheng District, Foshan City, Guangdong Province, China
Factory Address: No.7 Wende 4th street,Dawang High -Tech Zone, Zhaoqing, Guangdong, China