Acceptance standard for steel structure workshop

Steel structure workshop mainly refers to the main load-bearing components are composed of steel. Including steel columns, steel beams, steel structure foundations, steel roof trusses (of course, the span of the factory building is relatively large, and basically all are steel structure roof trusses now), steel roofs, and note that the walls of steel structures can also be maintained by brick walls. Due to the increase in steel production in my country, many of them have begun to use steel structure workshops, which can be divided into light and heavy steel structure workshops. Industrial and civil buildings constructed with steel are called steel structures. So what are the acceptance criteria for steel structure workshops? Let's take a look at it together. 1. The steel structure workshop and the foundation must be firmly connected, and there are no missing fixing screws. 2. The deviation between the steel structure workshop and the verticality shall not be greater than 10MM. 3. There should be no obvious gap between the board and the board. 4. Sealant must be applied to the joints between the steel structure workshop and aluminum grooves and aluminum windows. 5. After the installation of gutter and wind edge is completed, it is necessary to check whether the sealant is complete. 6. When the plate and aluminum are fixed, the blind rivets must be cracked neatly, and the spacing should not be greater than 400MM. 7. The installation of aluminum windows must be firm and the accessories are complete. 8. The roof is sprayed with profiled tiles, the splicing shall not be less than one corrugation, and the joints of the ridge tiles with good sealing and no leakage must be flat. 9. The downspout should be installed firmly and maintain verticality. 10. After the project is completed, clean up all dust and garbage, so that the windows are bright and the lights are on, and the exterior steel structure workshop is clean and tidy. 11. The exposed iron parts must be painted with anti-rust paint, the exposed foundation must be painted with cement, and the aluminum alloy at the root of the wall should be pressed firmly and not exposed. The above eleven knowledge points are about the 11 standards for the installation and acceptance of steel structure workshops. I hope it will be helpful to everyone!

GET IN TOUCH WITH Us
recommended articles
Knowledge News FAQ
How Do You Engineer a Mining Camp That Passes ESG Audits, Reduces Worker Fatigue & Withstands Earthquakes?
How do modular mining camps comply with ESG? How does camp design reduce worker fatigue? How are seismic & desert climates engineered? WELLCAMP answers key technical FAQs.
Traditional vs Modular Mining Camp: Which Construction Method Saves You 12 Months?
How are mining camps constructed? How long does a modular camp take? What's turnkey delivery? WELLCAMP answers key FAQs on camp types, timelines & complete solutions.
How Much Does a Mining Camp Really Cost? (And What's Included in a Turnkey Solution?)
What is mining camp accommodation? How much does a camp cost? What's included? WELLCAMP answers key FAQs on camp types, costs, facilities & history. Turnkey modular solutions.
Planning a Mining Camp? Here's What You Need to Know About Types, FIFO Design & Turnkey Delivery
What is a mining camp? How do FIFO camps work? WELLCAMP explains mining camp types, costs, and turnkey modular solutions. 20 years' experience, global delivery.
Sulawesi 6.7M Earthquake: What a Shallow-Focus Seismic Event Demands from Modular Shelter Engineering
6.7M shallow-focus earthquake hits Sulawesi, Indonesia. WELLCAMP foldable shelters deploy in 4 minutes, detachable homes for post-earthquake modular reconstruction. Inventory ready.
Dari Pabrik ke Tambang Terpencil: Bagaimana WELLCAMP Mengirimkan Solusi Kamp Detachable Turnkey di DR Congo
Studi kasus WELLCAMP: kamp detachable turnkey 500 orang di DR Congo dalam 120 hari. Produsen kamp modular 20 tahun pengalaman, pengiriman global tiga benua.
Philippines Earthquake: How Modular Prefab Shelters Support Rapid Post-Disaster Response

Philippines 7.8M earthquake: WELLCAMP folding container houses deploy in 4 minutes, 16-22 days contract to occupancy. Magnitude 8+ seismic rated emergency shelter. Inventory ready.
Customer service
detect